Passer au contenu

Publications de la Chambre

Les Débats constituent le rapport intégral — transcrit, révisé et corrigé — de ce qui est dit à la Chambre. Les Journaux sont le compte rendu officiel des décisions et autres travaux de la Chambre. Le Feuilleton et Feuilleton des avis comprend toutes les questions qui peuvent être abordées au cours d’un jour de séance, en plus des avis pour les affaires à venir.

Pour faire une recherche avancée, utilisez l’outil Rechercher dans les publications.

Si vous avez des questions ou commentaires concernant l'accessibilité à cette publication, veuillez communiquer avec nous à accessible@parl.gc.ca.

Publication du jour précédent Publication du jour prochain

Le vendredi 2 mars 2012 (No 88)

Questions

Questions

The complete list of questions on the Order Paper is available for consultation at the Table in the Chamber and on the Internet. Those questions not appearing in the list have been answered, withdrawn or made into orders for return.
La liste complète des questions inscrites au Feuilleton est disponible pour consultation au Bureau de la Chambre et sur Internet. Les questions auxquelles on a répondu ainsi que celles qui ont été retirées ou transformées en ordres de dépôt sont retirées de la liste.
Q-4072 — December 14, 2011 — Mr. Allen (Welland) — With respect to the Canadian Food Inspection Agency (CFIA): (a) how many new full-time meat inspection staff were hired by the CFIA between July 2009 and December 2011 and what positions and titles do these inspectors hold; (b) how many inspection staff and field inspection staff were hired by the CFIA to work on work-related food safety, as opposed to work related to plant and animal health between July 2009 and December 2011 and what positions and titles do these inspectors hold; (c) what is the total number of full-time equivalent meat inspectors employed by the CFIA currently and annually since January 2006; and (d) what was the total amount of funding allocated to the CFIA during 2010 and 2011? Q-4072 — 14 décembre 2011 — M. Allen (Welland) — En ce qui concerne l’Agence canadienne d’inspection des aliments (ACIA) : a) combien d’inspecteurs de viandes ont été embauchés à temps plein par l’ACIA entre juillet 2009 et décembre 2011 et quels sont leurs postes et titres; b) combien d’inspecteurs sur le terrain et d’autres personnes affectées à des postes d’inspection ont été embauchés par l’ACIA pour travailler dans le domaine de la salubrité des aliments par opposition au travail concernant la santé des animaux et la protection des végétaux, entre juillet 2009 et décembre 2011, et quels sont leurs postes et titres; c) quel est le nombre total, en équivalents temps plein, d’inspecteurs de viandes employés actuellement par l’ACIA et le total annuel depuis janvier 2006; d) quel est le montant total des crédits alloués à l’ACIA en 2010 et en 2011?
Q-4082 — December 14, 2011 — Mr. Allen (Welland) — With respect to the July 2009 “Report of the Independent Investigator into the 2008 Listeriosis Outbreak” (Weatherhill Report), what progress has the Canadian Food Inspection Agency made as concerns each of the report’s 57 recommendations? Q-4082 — 14 décembre 2011 — M. Allen (Welland) — En ce qui concerne le « Rapport de l’enquêteure indépendante sur l’éclosion de listériose de 2008 » (rapport Weatherhill) publié en juillet 2009, quels progrès l’Agence canadienne d’inspection des aliments a-t-elle faits relativement aux 57 recommandations formulées dans le rapport?
Q-4092 — December 14, 2011 — Ms. Laverdière (Laurier-Sainte-Marie) — With regard to Ben Ali family members living in Canada: (a) what are the names of Ben Ali family members currently residing in Canada and for each individual, what is (i) their immigration or refugee status, (ii) the nature of their assets; (b) what actions has the government taken to freeze the assets of Ben Ali family members, including the Trabelsi and El Materi families, (i) what are the names of people whose assets have been or will be frozen, (ii) for each person, what is the nature and value of their assets, (iii) on what date were the assets frozen, (iv) if these assets were not frozen, why not and by what date will they be frozen; (c) will the government send assets seized from Ben Ali family members to the government of Tunisia; (d) on what day was Belhassen Trabelsi granted permanent residency in Canada, (i) how did he achieve permanent residency, (ii) were there any inconsistencies in Trabelsi’s application for permanent residency, (iii) is the government currently investigating Trabelsi’s status as a permanent resident and, if so, what are the preliminary conclusions of this investigation; (e) will the government extradite or deport members of the Ben Ali family from Canada; (f) since January 2011, what correspondence has the government had with Tunisian authorities with regard to Ben Ali family members in Canada, (i) what is the date and nature of the correspondence, (ii) what are the names of Canadian governmental officials involved in said correspondence, (iii) what response has the government sent to Tunisian authorities with regard to said correspondence; and (g) what correspondence has the government received from the Tunisian community in Canada regarding the Ben Ali family and their assets, (i) what is the date and nature of the correspondence, (ii) what are the names of Canadian governmental officials involved in said correspondence, (iii) what response has the government sent to the Tunisian community in Canada with regard to said correspondence? Q-4092 — 14 décembre 2011 — Mme Laverdière (Laurier-Sainte-Marie) — En ce qui concerne les membres de la famille Ben Ali qui vivent au Canada : a) quels sont les noms des membres de la famille Ben Ali qui résident au Canada, et, pour chaque personne, quel est (i) son statut d’immigrant ou de réfugié, (ii) la nature de ses avoirs; b) quelles mesures le gouvernement a-t-il prises pour geler les avoirs des membres de la famille Ben Ali, y compris des familles Trabelsi et El Materi, (i) quels sont les noms des personnes dont les avoirs ont été ou seront gelés, (ii) pour chaque personne, quelle est la nature et la valeur de ses avoirs, (iii) à quelle date ses avoirs ont-ils été gelés, (iv) si ces avoirs n’ont pas été gelés, pourquoi, et quand va-t-on les geler; c) le gouvernement va-t-il renvoyer au gouvernement de la Tunisie les avoirs saisis aux membres de la famille Ben Ali; d) à quelle date Belhassen Trabelsi a-t-il obtenu la résidence permanente au Canada, (i) comment celui-ci a-t-il réussi à obtenir la résidence permanente, (ii) la demande de résidence permanente de M. Trabelsi présentait-elle des irrégularités, (iii) une enquête du gouvernement est-elle en cours sur le statut de résident permanent de M. Trabelsi, et, le cas échéant, quelles sont les conclusions préliminaires de cette enquête; e) le gouvernement extradera-t-il ou expulsera-t-il du Canada les membres de la famille Ben Ali; f) depuis janvier 2011, quelle correspondance le gouvernement entretient-il avec les autorités tunisiennes à l’égard des membres de la famille Ben Ali qui se trouvent au Canada, (i) quelles sont la date et la nature de cette correspondance, (ii) quels sont les noms des fonctionnaires du gouvernement impliqués dans ladite correspondance, (iii) quelle réponse le gouvernement a-t-il envoyée aux autorités tunisiennes à l’égard de ladite correspondance; g) quelle correspondance le gouvernement a-t-il reçue de la communauté tunisienne du Canada au sujet de la famille Ben Ali et de ses avoirs, (i) quelles sont la date et la nature de cette correspondance, (ii) quels sont les noms des fonctionnaires du gouvernement impliqués dans ladite correspondance, (iii) quelle réponse le gouvernement a-t-il envoyée à la communauté tunisienne du Canada à l’égard de ladite correspondance?
Q-4102 — December 14, 2011 — Ms. Laverdière (Laurier-Sainte-Marie) — With regard to the Office of Religious Freedom: (a) when did the government decide to establish an Office of Religious Freedom and at whose request; (b) what is the mandate and the objectives of this office; (c) what is the budget breakdown of the office for (i) staff, (ii) programs, (iii) operations; (d) what is the reporting structure of the office; (e) what will the office produce; (f) how many people will be employed in this office and what will be their level; (g) what are the hiring criteria and salary levels for each person employed in this office; (h) how will this office work differently from other sections of the Department of Foreign Affairs and International Trade (DFAIT) already working on human rights issues; (i) who was consulted regarding the creation of the office, (i) when did the consultations take place, (ii) what are the names and affiliations of those who were consulted; (j) what are the names, positions, and religious affiliations of the guests who attended consultations on a new Office of Religious Freedom in October 2011, (i) how many people from religions including, but not limited to, Islam, Hinduism, Sikhism, Taoism, Buddhism were invited to the meeting, (ii) how were the panellists and participants chosen for the meeting with Minister Baird, (iii) who made the final decisions on panellists and participants chosen for the meeting, (iv) what discussions were held at DFAIT about inviting Amnesty International and why was this organization not invited; and (k) who are the employees responsible for the development of the Office of Religious Freedom within (i) the Prime Minister's Office, (ii) the Minister of Foreign Affairs’ Office, (iii) other Ministers’ offices, (iv) DFAIT, (v) other government departments? Q-4102 — 14 décembre 2011 — Mme Laverdière (Laurier-Sainte-Marie) — En ce qui concerne le Bureau de la liberté de religion : a) quand et à la demande de qui le gouvernement a-t-il décidé de l’établir; b) quels en sont le mandat et les objectifs; c) quel en est le budget (i) de personnel, (ii) de programmes, (iii) de fonctionnement; d) quelle en est la structure de rapport; e) que produira-t-il; f) combien d’employés comptera-t-il et quel sera leur niveau; g) quels sont les critères d’embauche et les niveaux de rémunération de ces employés; h) en quoi le mandat du bureau se distinguera-t-il de celui des autres secteurs du ministère des Affaires étrangères et du Commerce international (MAECI) qui s’occupent déjà de droits de la personne; i) qui a-t-on consulté au sujet de la création du bureau, (i) quand les consultations ont-elles eu lieu, (ii) quel est le nom et l’affiliation religieuse de ceux qui ont été consultés; j) quel est le nom, la fonction et l’affiliation religieuse de ceux qui ont participé aux consultations sur la création du Bureau de la liberté de religion en octobre 2011, (i) combien de personnes de confession musulmane, hindouiste, sikhe, taoïste, bouddhiste, entre autres, ont été invitées à la réunion, (ii) comment les experts et les participants invités à la réunion avec le ministre Baird ont-ils été choisis, (iii) qui a eu le dernier mot quant au choix des experts et des participants, (iv) quelles discussions ont eu lieu au MAECI au sujet de la possibilité d’inviter Amnistie Internationale et pourquoi cette organisation n’a-t-elle pas été invitée; k) qui sont les employés responsables du dévéloppement du Bureau de la liberté de religion au sein (i) du Bureau du premier ministre, (ii) du bureau du ministre des Affaires étrangères, (iii) du bureau d’autres ministres, (iv) du MAECI, (v) d’autres ministères?
Q-4112 — December 14, 2011 — Ms. Charlton (Hamilton Mountain) — With regard to the government's dealings with U.S. Steel: (a) what was the government’s last claim for monetary damages relating to U.S. Steel and the Investment Canada Act; (b) what are the terms of the settlement with U.S. Steel; (c) to what extent will the settlement cover lost wages and pension benefits of current and former U.S. Steel employees; (d) what job guarantees are included in the settlement mentioned in (b); (e) how much will each current and former employee of U.S. Steel receive under the settlement; and (f) what costs have been recovered from U.S. Steel for court costs? Q-4112 — 14 décembre 2011 — Mme Charlton (Hamilton Mountain) — En ce qui concerne les transactions entre le gouvernement du Canada et U.S. Steel : a) quelle a été la dernière demande de dommages pécuniaires du gouvernement à l’égard de U.S. Steel et de la Loi sur Investissement Canada; b) quelles sont les conditions du règlement avec U.S. Steel; c) dans quelle mesure le règlement couvrira-t-il les salaires et les prestations de retraite perdus par les employés actuels et les anciens employés de U.S. Steel; d) quelles garanties d’emploi sont prévues dans le règlement mentionné en b); e) combien chaque employé actuel et ancien employé de U.S. Steel recevra-t-il en vertu du règlement; f) quels coûts ont été recouvrés auprès de U.S. Steel à l’égard des frais de justice?
Q-4122 — January 26, 2012 — Mr. Mai (Brossard—La Prairie) — With regard to the Canada Revenue Agency’s (CRA) responses to the provisions of the Internal Revenue Service (IRS) regarding the Report of Foreign Bank and Financial Accounts (FBAR): (a) according to the government’s analysis, do the IRS provisions comply with the provisions of the Convention Between Canada and the United States of America With Respect to Taxes on Income and on Capital and its amending Protocol (2007); (b) are there Canadian exemptions to FBAR; (c) has Canada negotiated the FBAR provisions with United States Treasury Officials or the IRS, (i) at what time was the government made aware of these provisions, (ii) how long did it take for Canada to respond to the changes made by the IRS and the United States Treasury; (d) how will the government ensure that the CRA does not act on behalf of the IRS to collect revenues and penalties; (e) has Canada informed dual citizens about their tax obligations resulting from FBAR; (f) what was the number of exchanges of information between Canada and the United States of America this year and during the past ten years regarding FBAR, (i) has the CRA set internal deadlines to be able to respond to exchange of information requests in a timely manner, (ii) will Canada work to improve bilateral cooperation on this issue, (iii) has there been an increase of exchange of information requests at the CRA due to FBAR; (g) will the government lose revenue as a result of the implementation of FBAR; (h) what are the cost implications emanating from FBAR (i) for the government, (ii) for the CRA, (iii) for Canadian banks, (iv) who will absorb these costs, (v) are there other types of non-financial costs such as efficiency or fairness reductions; (i) how many complaints has the CRA received regarding FBAR or related vexatious inquiries by the IRS, (i) what are the main complaints, (ii) what has the CRA done concerning these complaints, (iii) what department at the CRA is in charge of dealing with complaints of this nature, (iv) will the CRA cut Full-Time Equivalents from that department or reduce its funding, (v) has the office of the Taxpayers’ Ombudsman looked into the matter; (j) will FBAR prevent double taxation of pre-migration gain; (k) has there been an increase in arbitration cases due to active procedures by the IRS, (i) what departments are most affected, (ii) has the CRA cut Full-Time Equivalents from each of these affected departments or reduced their funding; (l) will FBAR affect different saving vehicles such as, but not limited to, (i) Registered Retirement Savings Plans, (ii) Registered Education Savings Plans, (iii) Registered Disability Savings Plans, (iv) Tax-Free Savings Accounts; and (m) how many Canadian-American dual citizens are affected by FBAR and does Canada have contact information for the dual citizens affected by FBAR? Q-4122 — 26 janvier 2012 — M. Mai (Brossard—La Prairie) — En ce qui concerne les réponses de l’Agence du Revenu du Canada (ARC) aux dispositions de l’Internal Revenue Service (IRS) en ce qui a trait au Rapport sur les comptes bancaires étrangers (FBAR) : a) selon l’analyse du gouvernement, est-ce que les dispositions de l’IRS respectent celles de la Convention entre le Canada et les États-Unis d’Amérique en matière d’impôts sur le revenu et sur la fortune et du Protocole la modifiant (2007); b) des dérogations au FBAR sont-elles accordées au Canada; c) le Canada a-t-il négocié les dispositions du FBAR avec des représentants du département du Trésor des États-Unis ou avec l’IRS, (i) à quel moment le gouvernement a-t-il été mis au courant de ces dispositions, (ii) combien de temps le Canada a-t-il mis à réagir aux changements apportés par l’IRS et le département du Trésor des États-Unis; d) comment le gouvernement veillera-t-il à ce que l’ARC n’agisse pas au nom de l’IRS pour percevoir les recettes et les amendes; e) le Canada a-t-il informé les personnes détenant la double citoyenneté de leurs obligations fiscales par suite du FBAR; f) le FBAR a donné lieu à combien d’échanges d’information entre le Canada et les États-Unis d’Amérique cette année et au cours des dix dernières années, (i) l'ARC a-t-elle fixé des échéances à l’interne pour pouvoir répondre aux demandes d’échange d’information de façon rapide, (ii) le Canada travaillera-t-il à améliorer la collaboration bilatérale sur ce point, (iii) y a-t-il eu une augmentation des demandes d’échange d’information à l'ARC par suite du FBAR; g) le gouvernement perdra-t-il des revenus par suite de la mise en œuvre du FBAR; h) quelles sont les implications financières du FBAR (i) pour le gouvernement, (ii) pour l'ARC, (iii) pour les banques canadiennes, (iv) qui assumera ces coûts, (v) y a-t-il d’autres types de coûts non financiers, comme la réduction d’efficacité ou d’équité; i) combien de plaintes l'ARC a-t-elle reçu au sujet du FBAR ou de demandes vexatoires à ce sujet par l’IRS, (i) quelles sont les principales plaintes, (ii) qu’a fait l'ARC au sujet de ces plaintes, (iii) quel département de l’ARC est chargé de répondre aux plaintes de cette nature, (iv) l'ARC va-t-elle réduire le nombre d’équivalents temps complet ou réduire son financement, (v) le bureau de l’ombudsman des contribuables s’est-il penché sur la question; j) le FBAR empêchera-t-il la double imposition des gains pré-migration; k) y a-t-il eu augmentation du nombre de cas d’arbitrage par suite de procédures actives par l’IRS, (i) quels ministères sont les plus touchés, (ii) l'ARC a-t-elle réduit le nombre d’équivalents temps complet dans chacun des ministères touchés ou réduit leur financement; l) le FBAR aura-t-il des incidences sur divers instruments d’épargne, comme, entre autres, (i) le régime enregistré d’épargne-retraite, (ii) les régimes enregistrés d’épargne-études, (iii) le régime enregistré d’épargne-invalidité, (iv) les comptes d’épargne libres d’impôt; m) combien de personnes ayant la double citoyenneté canadienne-américaine sont touchées par le FBAR et le Canada a-t-il leurs coordonnées?
Q-4132 — January 26, 2012 — Mr. Mai (Brossard—La Prairie) — With regard to the Canada Revenue Agency’s (CRA) response to the provisions of the Internal Revenue Service (IRS) regarding the Foreign Account Tax Compliance Act (FATCA): (a) according to the government’s analysis, do the FATCA provisions comply with the provisions of the Convention Between Canada and the United States of America With Respect to Taxes on Income and on Capital and its amending Protocol (2007); (b) how many citizens from the United States of America will be affected by FATCA, (ii) are there specific Canadian exemptions to FATCA; (c) has Canada negotiated with United States Treasury officials or the IRS following the announcement of FATCA provisions, (i) at what time was the government made aware of these provisions, (ii) how long did it take Canada to respond to the initial creation of FATCA and its implementation, (iii) are there ongoing negotiations in this regard; (d) will Canada inform dual citizens about FATCA and, if so, (i) how, (ii) at what time, (iii) what department or agencies will be responsible; (e) has the government conducted any studies or mandated a task force to look into how much FATCA will cost Canadians and, if so, what are the cost implications resulting from the additional regulations and demands, (i) for the government, (ii) for the CRA, (iii) for Canadian banks, (iv) who will absorb these costs, (v) are there other types of non-financial costs such as efficiency or fairness reductions; (f) which Canadian civil liberties associations or other types of association has the government met with to discuss the privacy implications of FATCA and what actions will the government undertake to protect the fundamental civil liberties of all Canadians in this regard; (g) according to the government’s analysis, do the FATCA provisions comply with the provisions of the Privacy Act or the Personal Information Protection and Electronic Documents Act, and if so, which department undertook this assesment; (h) in order to discuss the implications of FATCA, who within the government has met with (i) Canadian banks, (ii) other financial institutions, (iii) insurance companies; (i) how many complaints has the CRA received regarding FATCA, (i) what are the main complaints, (ii) what has the CRA done concerning these complaints, (iii) what department at the CRA is in charge of dealing with complaints of this nature, (iv) will the CRA cut Full-Time Equivalents from that department or reduce its funding, (v) has the office of the Taxpayers’ Ombudsman looked into the matter; (j) has Canada ever studied the development or implementation of a process similar to FATCA to improve tax compliance involving foreign financial assets and offshore accounts; (k) who will be most affected by FATCA and have concerns been raised by entities such as, but not limited to, (i) interests groups, (ii) stakeholder groups, (iii) hedge funds; and (l) will FATCA affect different saving vehicles such as, but not limited to, (i) Registered Retirement Savings Plans, (ii) Registered Education Savings Plans, (iii) Registered Disability Savings Plans, (iv) Tax-Free Savings Accounts? Q-4132 — 26 janvier 2012 — M. Mai (Brossard—La Prairie) — En ce qui concerne les réponses de l’Agence du Revenu du Canada aux dispositions de l’Internal Revenue Service (IRS) en ce qui a trait à la Foreign Account Tax Compliance Act (FATCA) : a) selon l’analyse du gouvernement, est-ce que les dispositions de la FATCA respectent celles de la Convention entre le Canada et les États-Unis d’Amérique en matière d’impôts sur le revenu et sur la fortune et du Protocole la modifiant (2007); b) combien de citoyens des États-Unis d’Amérique seront touchés par la FATCA, (ii) des dérogations précises à la FATCA sont-elles accordées au Canada; c) le Canada a-t-il négocié avec des représentants du département du Trésor des États-Unis ou avec l’IRS à la suite de l’annonce des dispositions de la FATCA, (i) à quel moment le gouvernement a-t-il été mis au courant de ces dispositions, (ii) combien de temps le Canada a-t-il mis à réagir à la création initiale de la FATCA et à sa mise en œuvre, (iii) y a-t-il des négociations en cours à cet égard; d) le Canada informera-t-il les personnes détenant la double citoyenneté sur la FATCA, auquel cas, (i) comment, (ii) à quel moment, (iii) quel ministère ou organismes en seront chargés; e) le gouvernement a-t-il effectué des recherches ou confié le mandat à un groupe de travail d’examiner combien la FATCA coûtera aux Canadiens, auquel cas, quelles sont les implications financières des règlements et exigences supplémentaires, (i) pour le gouvernement, (ii) pour l'ARC, (iii) pour les banques canadiennes, (iv) qui assumera ces coûts, (v) y a-t-il d’autres types de coûts non financiers, comme la réduction d’efficacité ou d’équité; f) quelles associations canadiennes de défense des libertés civiles ou autres types d’associations le gouvernement a-t-il rencontrées pour discuter des conséquences pour la vie privée qu’a la FATCA et quelles mesures le gouvernement adoptera-t-il pour protéger les libertés civiles fondamentales de tous les Canadiens à cet égard; g) selon l’analyse du gouvernement, les dispositions de la FATCA respectent-elles les dispositions de la Loi sur la protection des renseignements personnels ou de la Loi sur la protection des renseignements personnels et les documents électroniques auquel cas, quel ministère en a effectué l’évaluation; h) dans le but de discuter des incidences de la FATCA, qui au sein du gouvernement a rencontré (i) des banques canadiennes, (ii) d’autres institutions financières, (iii) des compagnies d’assurance; i) combien de plaintes l'ARC a-t-elle reçues au sujet de la FATCA, (i) quelles sont les principales plaintes, (ii) qu’a fait l'ARC au sujet de ces plaintes, (iii) quel département de l’ARC est chargé de répondre aux plaintes de cette nature, (iv) l'ARC va-t-elle réduire le nombre d’équivalents temps complet ou réduire son financement, (v) le bureau de l’ombudsman des contribuables s’est-il penché sur la question; j) le Canada a-t-il déjà étudié l’élaboration ou l’instauration d’un processus similaire à la FATCA dans le but d’accroître l’observation fiscale en ce qui touche les avoirs financiers étrangers et les comptes à l’étranger; k) qui sera le plus touché par la FATCA et des inquiétudes ont-elles été exprimées par des entités, comme, entre autres, (i) des groupes d’intérêt, (ii) des groupes d’intervenants, (iii) des fonds de couverture; l) la FATCA aura-t-elle des incidences sur divers instruments d’épargne, comme, entre autres, (i) le régime enregistré d’épargne-retraite, (ii) les régimes enregistrés d’épargne-études, (iii) le régime enregistré d’épargne-invalidité, (iv) les comptes d’épargne libres d’impôt?
Q-4152 — January 26, 2012 — Mrs. Day (Charlesbourg—Haute-Saint-Charles) — With regard to Natural Resources Canada’s ecoENERGY program: (a) what is the total amount spent, broken down by year and province, since the program’s first year of operation up to and including the current fiscal year on (i) ecoENERGY Retrofit – Homes, (ii) ecoENERGY Efficiency, (iii) marine renewable energy enabling measures, (iv) the clean energy policy group, (v) ecoENERGY for biofuels, (vi) ecoENERGY Innovation Initiative; (b) how many individuals or organizations have received grants for each of the programs listed in (a), since the first year of operation up to and including the current fiscal year, broken down by year and province, (i) what is the average amount of the grants awarded, (ii) how many applications were submitted and how many rejected, (iii) what was identified as an “acceptable” turnaround time for the receipt of grant funding, (iv) how many approved grants were processed beyond a “reasonable” turnaround time; and (c) other than the programs listed in (a), which programs to combat climate change and promote energy efficiency are currently funded by Natural Resources Canada, and what is the total amount spent on each of these programs? Q-4152 — 26 janvier 2012 — Mme Day (Charlesbourg—Haute-Saint-Charles) — En ce qui concerne le programme écoÉNERGIE du Ministère des Ressources naturelles : a) quel est le montant total dépensé, identifié par année et par province, depuis la première année de mise en œuvre du programme jusqu’à l’exercice en cours inclusivement pour (i) le programme écoÉNERGIE rénovation maisons, (ii) le programme écoÉNERGIE efficacité énergétique, (iii) les mesures habilitantes concernant l’énergie marine renouvelable, (iv) le groupe sur la politique d’énergie propre, (v) le programme écoÉNERGIE pour le carburant de remplacement, (vi) le programme écoÉNERGIE sur l’innovation; b) pour chaque programme énuméré en a), depuis sa mise en œuvre jusqu’à l’exercice en cours inclusivement, identifié par province et par année, combien de personnes ou d’organisations ont bénéficié de subventions, (i) quelle a été la moyenne du montant des subventions allouées, (ii) combien de demandes ont été soumises et combien ont été rejetées, (iii) quel délai de réception des subventions par les bénéficiaires a été défini comme « acceptable », (iv) combien de demandes acceptées ont été traitées au-delà du délai défini comme « raisonnable »; c) quels programmes, visant à combattre les changements climatiques et à promouvoir l’efficacité énergétique, autres que ceux énumérés en a), sont actuellement financés par le Ministère des Ressources naturelles et à combien s’élève le montant d’argent total investi pour chacun de ces programmes?
Q-4162 — January 26, 2012 — Mrs. Day (Charlesbourg—Haute-Saint-Charles) — With regard to government funding allocated within the constituency of Charlesbourg—Haute-Saint-Charles since fiscal year 2004-2005, up to and including the current fiscal year: (a) what is the total amount of funding by (i) department, (ii) agency, (iii) other government entity, (iv) program; and (b) how many (i) full-time, (ii) part-time jobs were created as a direct result of this funding? Q-4162 — 26 janvier 2012 — Mme Day (Charlesbourg—Haute-Saint-Charles) — En ce qui concerne le financement gouvernemental distribué dans la circonscription de Charlesbourg—Haute-Saint-Charles depuis l’exercice 2004-2005 jusqu’à l’exercice en cours inclusivement : a) quel est le montant total de ce financement par (i) ministère, (ii) organisme, (iii) toute autre entité gouvernementale, (iv) programme; b) ce financement est directement responsable de combien d’emplois (i) à temps plein, (ii) à temps partiel?
Q-4172 — January 26, 2012 — Mrs. Day (Charlesbourg—Haute-Saint-Charles) — With regard to government funding allocated within the constituency of Charlesbourg—Haute-Saint-Charles since fiscal year 2004-2005, up to and including the current fiscal year, what are the total budget cuts, both in dollars and as a percentage of the total budget, by (i) department, (ii) agency, (iii) other government entity, (iv) program? Q-4172 — 26 janvier 2012 — Mme Day (Charlesbourg—Haute-Saint-Charles) — En ce qui concerne le financement gouvernemental distribué dans la circonscription de Charlesbourg—Haute-Saint-Charles depuis l’exercice 2004-2005 jusqu’à l’exercice en cours inclusivement, quels sont les montants totaux des coupures budgétaires effectuées, en valeur absolue et en pourcentage du budget total, par (i) ministère, (ii) organisme, (iii) tout autre entité gouvernementale, (iv) programme?
Q-4182 — January 26, 2012 — Mrs. Day (Charlesbourg—Haute-Saint-Charles) — With regard to social and environmental security in the Canadian Arctic and following such environmental disasters as the Exxon Valdez oil spill in Alaska and the explosion on the Deepwater Horizon drilling rig: (a) how many emergency response or contingency plans are currently in effect, (i) which departments are responsible for these plans, (ii) in the event that several departments are responsible for certain plans, what coordination measures have been introduced to implement them, (iii) have these plans been adapted to meet the conditions in the Canadian Arctic; (b) what is the total amount spent by the government on social and environmental security in the Canadian Arctic from 2004-2005 up to and including the current fiscal year; (c) what facilities exist and are currently available in Canada to deal with an environmental catastrophe such as an Arctic oil spill; (d) how many infrastructures such as roadways, airfields, staging areas, supply areas, medical facilities, ships, aircraft and kilometres of booms are currently available and ready for use in Canada; (e) what are the estimated response times for oil spills in the Canadian Arctic given the geographic isolation of the area; and (f) what is the total labour force that Canada can call on to take action in this region in the event of a disaster like an oil spill, (i) how many people in Canada are currently trained for this type of response and where is this training offered, (ii) how many search and rescue personnel are currently north of the 60th parallel? Q-4182 — 26 janvier 2012 — Mme Day (Charlesbourg—Haute-Saint-Charles) — En ce qui concerne la sécurité sociale et environnementale dans l’Arctique canadien et suite à des catastrophes environnementales telles que le déversement de l’EXXON Valdez en Alaska et l’explosion de la plateforme de Deepwater Horizon : a) combien de plans d’intervention d’urgence ou de plans de contingence sont actuellement en vigueur, (i) de quels ministères relèvent ces plans, (ii) dans le cas où certains plans relèvent de plusieurs ministères, quel type de coordination est mis en œuvre pour l’exécution de ceux-ci, (iii) ces plans sont-ils adaptés pour les conditions particulières de l’Arctique canadien; b) quel est le montant d’argent total investi par le gouvernement depuis 2004-2005 et jusqu’à l’exercice en cours inclusivement en matière de sécurité sociale et environnementale dans l’Arctique canadien; c) quels sont les équipements en fonction et actuellement disponibles au Canada pour faire face à une catastrophe environnementale telle un déversement de pétrole dans l’Arctique canadien; d) combien d’infrastructures telles des réseaux routiers, terrains d’aviation, zones de rassemblement, zones d’approvisionnement, zones d’installations médicales, navires, aéronefs et de kilomètres de barrage de confinement de pétrole (booms) sont actuellement disponibles et prêts pour usage au Canada; e) à combien sont estimés les délais d’intervention étant donné l’éloignement géographique de l’Arctique canadien dans le cas d’un déversement de pétrole dans cette région; f) de combien de main d’œuvre au total le Canada dispose-t-il pour intervenir dans cette région en cas de catastrophe comme un déversement de pétrole, (i) combien de personnes sont actuellement formées au Canada pour ce genre d’intervention et qui dispense ces formations, (ii) combien d’effectifs de recherche et sauvetage sont actuellement dans la région située au nord du 60e parallèle?
Q-4192 — January 30, 2012 — Ms. Duncan (Etobicoke North) — With respect to the risk of corrosion and spills and other safety concerns arising from the transport of bitumen in pipelines, and to government action to address these risks: (a) how does diluted bitumen compare with West Texas Intermediate (WTI) in terms of (i) abrasive material content, (ii) acid concentration, (iii) sulphur content, (iv) viscosity; (b) to what extent is diluted bitumen more likely than WTI to cause corrosion or erosion in the pipelines through which they respectively flow; (c) what is the composition of diluted bitumen in Canada; (d) what are all of the volatile chemicals, persistent organic pollutants or carcinogenic substances present in diluted bitumen in Canada; (e) in the process of diluting bitumen in Canada, what are the (i) natural gas condensates used, (ii) other petroleum products used; (f) what is the process by which diluted bitumen corrodes pipelines, with specific reference to (i) abrasion, (ii) friction, (iii) high pressure, (iv) settling of sediment, (v) velocity, (vi) sulphur-reducing bacteria, (vii) other significant factors; (g) for all proposed or existing National Energy Board (NEB)-regulated pipelines, what is (i) the amount of hard sediment passing through the pipeline annually, (ii) the average pressure, (iii) the average temperature; (h) what, if any, (i) research, (ii) action, (iii) investment has the government undertaken to determine whether diluted bitumen can flow safely through pipelines; (i) what, if any, (i) research, (ii) action, (iii) investment has the government undertaken to determine whether or not conventional crude should be distinguished from diluted bitumen when setting minimum standards for pipelines; (j) what, if any, (i) research, (ii) action, (iii) investment has the government undertaken to design safety and spill responses and spill liability management capabilities that are appropriate specifically to diluted bitumen; (k) how does a diluted bitumen spill compare with a conventional light sweet oil spill in terms of (i) the impacts of the natural gas liquid condensate used to dilute the bitumen, (ii) diluted bitumen’s ability to form an ignitable and explosive mixture; (l) in the case of a diluted bitumen spill, at what temperatures would ignition of the spill occur, and what heat sources might cause ignition; (m) what, if any, are the (i) names, (ii) dates, (iii) conclusions, (iv) recommendations of research undertaken by the government concerning the environmental and economic risks of a diluted bitumen spill; (n) what, if any, are the (i) names, (ii) dates, (iii) conclusions, (iv) recommendations of risk analyses (including such factors as potential avalanches, flooding, remote location, rockslides, and snowpack) undertaken by the government concerning the danger of a diluted bitumen spill; (o) what, if any, are the (i) names, (ii) dates, (iii) conclusions, (iv) recommendations of analyses undertaken by the government concerning the possible economic, environmental, and social impacts of a diluted bitumen spill on First Nation and non-First Nation ways of life; (p) what are the challenges associated with clean-up specifically of a diluted bitumen spill, in rivers, wetland and marine environments (including when surface water is frozen), particularly as raw bitumen is heavier than water; (q) what appropriate clean-up operations might, in case of a diluted bitumen spill, be required in terms of equipment, personnel, and supplies, compared to a spill of light sweet crude oil; (r) what are the likely economic and environmental costs of a diluted bitumen spill compared to a spill of light sweet crude oil; (s) how might a diluted bitumen spill impact human health, including, but not limited to, (i) potential impacts both in the short-term and the long-term of exposure to toxins, including benzene, hydrogen sulphide, polycyclic aromatic hydrocarbons, and n-hexane, (ii) potential impacts of exposure to toxins (such as arsenic, nickel, mercury and other heavy metals that do not biodegrade) that can bio-accumulate in the food chain; (t) what health and safety precautions does the government require emergency personnel to take when responding specifically to diluted bitumen spills; (u) what are all pipeline spills that have occurred from 1990 to 2010 in NEB-regulated pipelines, including (i) location, (ii) cause, (iii) affected area, (iv) environmental costs, (v) significant challenges to clean-up, (vi) impacts on human health, (vii) equipment, personnel and supplies required, (viii) economic costs; (v) what, if any, (i) research, (ii) action, (iii) investment has the government taken to evaluate the need for new Canadian pipeline safety regulations and standards that reflect the unique characteristics of diluted bitumen, and to restrict further diluted bitumen pipeline development until adequate safety regulations are in place; (w) what, if any, (i) research, (ii) action, (iii) investment has the government undertaken concerning changes to the design, operation and decommissioning of pipelines that may be necessary due to impacts of climate change, including but not limited to melting permafrost, changing moisture regimes, more severe storm events, increased incidence of forest fires, and slope instabilities; (x) what, if any, (i) research, (ii) action, (iii) investment has the government undertaken regarding the adoption of pipeline regulations and standards that require new pipeline routes to avoid landslide-prone routes, and that provide an adequate risk assessment for risks to pipelines arising from landslides and snow avalanches; (y) what, if any, (i) research, (ii) action, (iii) investment has the government undertaken to evaluate the risk of pipeline spills caused by multiple incidents happening at the same time, including worst-case scenarios; (z) what specific action and investment will the government take to ensure (i) that bitumen pipeline operators will fix safety problems identified at their facilities, (ii) that bitumen pipeline operators keep their emergency procedures up-to-date; (aa) what specific actions will the government take to ensure that pipeline companies which transport bitumen employ emergency-procedures manuals that adequately (i) identify the hazards posed by the operation of the pipelines, (ii) assess the risks posed by those hazards, (iii) map nearby residences and evacuation routes, (iv) describe and locate emergency response equipment, (v) identify any environmentally sensitive areas potentially affected by an incident, (vi) explain governmental roles in an emergency response; and (bb) in what ways, if any, must the emergency-procedures manuals referred to in sub-question (aa) differ from those concerning pipelines that do not carry bitumen? Q-4192 — 30 janvier 2012 — Mme Duncan (Etobicoke-Nord) — En ce qui concerne le risque de corrosion et de déversements et d’autres questions de sécurité découlant du transport de bitume par pipeline, et les mesures prises par le gouvernement pour réduire ces risques : a) comment le bitume dilué se compare-t-il au West Texas Intermediate (WTI) pour ce qui est (i) de la teneur en abrasifs, (ii) de la concentration en acides, (iii) de la teneur en soufre, (iv) de la viscosité; b) dans quelle mesure le bitume dilué est-il plus susceptible que le WTI de causer de la corrosion ou de l’érosion dans les pipelines servant au transport de chacun; c) quelle est la composition du bitume dilué au Canada; d) quels sont tous les produits chimiques volatiles, polluants organiques persistants ou substances cancérigènes présents dans le bitume dilué au Canada; e) dans le processus de dilution du bitume au Canada, quels sont (i) les condensats de gaz naturel utilisés, (ii) les autres produits pétroliers utilisés; f) quel est le processus par lequel le bitume dilué corrode les pipelines, pour ce qui est plus précisément (i) de l’abrasion, (ii) de la friction, (iii) de la haute pression, (iv) de la sédimentation, (v) de la vélocité, (vi) des bactéries capables de réduire les sulfates, (vii) d’autres facteurs importants; g) pour tous les pipelines proposées ou existants réglementés par l’Office national de l’énergie (ONE), quelle est (i) la quantité de sédiments durs passant par le pipeline annuellement, (ii) la pression moyenne, (iii) la température moyenne; h) le cas échéant, quels ont été (i) les recherches, (ii) les mesures, (iii) les investissements du gouvernement du Canada pour déterminer si les sédiments dilués peuvent être transportés sans danger par les pipelines; i) le cas échéant, quels ont été, (i) les recherches, (ii) les mesures, (iii) les investissements du gouvernement pour déterminer si le pétrole brut classique devrait ou non être distingué du bitume dilué quand ils s’agit d’établir des normes minimales pour les pipelines; j) le cas échéant, quels ont été (i) les recherches, (ii) les mesures, (iii) les investissements du gouvernement pour concevoir des plans d’intervention et de gestion de la responsabilité en cas de déversement de bitume dilué; k) comment un déversement de bitume dilué se compare-t-il à un déversement de pétrole léger non sulfuré classique, pour ce qui est (i) des impacts des condensats liquides de gaz naturel utilisés pour diluer le bitume, (ii) de la capacité du bitume dilué de former un mélange inflammable et explosif; l) dans le cas d’un déversement de bitume dilué, à quelles températures se produirait l’inflammation, et quelles sources de chaleur pourraient la provoquer; m) le cas échéant, quels sont (i) les noms, (ii) les dates, (iii) les conclusions, (iv) les recommandations des études entreprises par le gouvernement sur les risques environnementaux et économiques d’un déversement de bitume dilué; n) le cas échéant, quels sont (i) les noms, (ii) les dates, (iii) les conclusions, (iv) les recommandations des analyses des risques (y compris des facteurs comme d’éventuelles avalanches, une inondation, l’éloignement de la région, des glissements rocheux et des accumulations de neige) entreprises par le gouvernement sur les dangers d’un déversement de bitume dilué; o) le cas échéant, quels sont (i) les noms, (ii) les dates, (iii) les conclusions, (iv) les recommandations d’analyses entreprises par le gouvernement sur les incidences économiques, environnementales et sociales éventuelles d’un déversement de bitume dilué sur le mode de vie des Premières nations et d’autres collectivités; p) quels sont les défis associés au nettoyage proprement dit d’un déversement de bitume dilué dans les cours d’eau, les zones humides et les environnements marins (notamment lorsque les eaux de surface sont gelées), du fait surtout que le bitume brut est plus lourd que l’eau; q) quelles pourraient être les opérations de nettoyage requises, dans le cas d’un déversement de bitume dilué, en termes d’équipement, de personnel et de fournitures, par comparaison à un déversement de pétrole léger non sulfuré; r) quels sont les coûts économiques et environnementaux probables d’un déversement de bitume dilué comparativement à ceux d’un déversement de pétrole brut léger non sulfuré; s) quels effets pourrait avoir un déversement de bitume dilué sur la santé humaine, dont (i) les effets potentiels de l’exposition à court et long terme à des toxines, y compris le benzène, le sulfure d’hydrogène, les hydrocarbures aromatiques polycycliques et le n-hexane, (ii) les effets potentiels de l’exposition à des toxines (comme l’arsenic, le nickel, le mercure et d’autres métaux lourds qui ne sont pas biodégradables) qui peuvent entrer dans la chaîne alimentaire par bioaccumulation; t) quelles mesures de précaution en matière de santé et de sécurité le gouvernement demande-t-il au personnel d’urgence de prendre lorsqu’il intervient dans des cas de déversements de bitume dilué; u) quels sont tous les cas de déversements provenant de pipelines réglementés par l’ONE ayant eu lieu de 1990 à 2010, y compris (i) l’endroit, (ii) la cause, (iii) la zone touchée, (iv) les coûts environnementaux, (v) les principales difficultés liées au nettoyage, (vi) les répercussions sur la santé humaine, (vii) l’équipement, le personnel et les fournitures requis, (viii) les coûts économiques; v) le cas échéant, quels ont été (i) les recherches, (ii) les mesures, (iii) les investissements du gouvernement pour évaluer la nécessité d’établir, aux fins de la sécurité des pipelines, de nouveaux règlements et normes canadiens qui tiennent compte des caractéristiques propres au bitume dilué et pour restreindre la construction d’autres pipelines de bitume dilué, jusqu’à ce que des règlements de sécurité convenables soient mis en place; w) le cas échéant, quels ont été (i) les recherches, (ii) les mesures, (iii) les investissements du gouvernement au sujet des modifications à la conception, au fonctionnement et au déclassement des pipelines qui pourraient être requis en raison des effets des changements climatiques, dont la fonte du pergélisol, le changement des régimes d’humidité, l’augmentation de la violence des tempêtes, l’augmentation de la fréquence des feux de forêt et l’instabilité des pentes; x) le cas échéant, quels ont été (i) les recherches, (ii) les mesures, (iii) les investissements du gouvernement en ce qui concerne l’adoption de règlements et de normes sur les pipelines, exigeant l’établissement de nouveaux tracés pour éviter les endroits sujets aux glissements de terrain, et offrant une évaluation convenable des risques que posent les glissements de terrain et les avalanches pour les pipelines; y) le cas échéant, quels ont été (i) les recherches, (ii) les mesures, (iii) les investissements du gouvernement pour évaluer le risque de déversement provenant de pipeline causé par des incidents multiples simultanés, y compris les pires des scénarios; z) quels seront les mesures et les investissements précis du gouvernement pour veiller (i) à ce que les exploitants de pipelines de bitume corrigent les problèmes de sécurité détectés dans leurs installations, (ii) à ce que les exploitants de pipelines de bitume tiennent leurs procédures d’urgence à jour; aa) quelles mesures précises le gouvernement prendra-t-il afin de veiller à ce que les compagnies de pipeline transportant du bitume utilisent des manuels de procédures d’urgence qui (i) définissent correctement les dangers que présente le fonctionnement des pipelines, (ii) évaluent correctement les risques que posent ces dangers, (iii) dressent correctement le plan des résidences à proximité et des voies d’évacuation, (iv) décrivent et situent correctement l’équipement d’intervention d’urgence, (v) indiquent précisément toutes les régions écologiquement fragile pouvant être touchées par un incident, (vi) expliquent correctement les rôles gouvernementaux en cas d’intervention d’urgence; bb) le cas échéant, en quoi les manuels de procédures d’urgence mentionnés à la sous-question aa) doivent-ils être différents de ceux concernant les pipelines qui ne transportent pas de bitume?
Q-4202 — January 30, 2012 — Ms. Duncan (Etobicoke North) — With respect to Canada’s international commitments on climate change and the government’s withdrawal from the Kyoto Protocol: (a) for each of the international commitments that the government has made concerning climate change, (i) what is that commitment, (ii) what are the government’s obligations under it, (iii) does the government plan to fulfill each obligation or not; (b) what specific actions or negotiating positions were taken in support of the government’s statements that it (i) “went to Durban in a spirit of good will,” (ii) “went [to the Durban climate change conference] committed to being constructive,” (statement by Minister Kent, Foyer of the House of Commons, December 12, 2011); (c) in detail, how does the government plan to achieve the goal of reaching a new international agreement on climate change with particular reference to (i) how the government plans to achieve legally binding commitments for all major emitters, (ii) how the government plans to find solutions to meet the agreed-upon-objective of staying below 2°C of warming; (d) what information does the Minister of the Environment possess that supports his statement that “increasingly, support is growing for Canada’s position – from the EU, to the United States, Australia, New Zealand, least developed countries and the group of 43 small island states” (statement by Minister Kent, Foyer of the House of Commons, December 12, 2011); (e) does the Minister of the Environment possess information that Canada’s withdrawal from the Kyoto Protocol is a positive step for Canada’s economy, in contradiction of the National Roundtable on the Environment and the Economy’s projected costs of $21-43 billion annually by 2050 (depending on whether a low climate change–slow growth scenario or a high climate change–rapid growth scenario), and what is that information; (f) what, in detail, are the “radical and irresponsible choices” (statement by Minister Kent, Foyer of the House of Commons, December 12, 2011) that Canada was facing under the Kyoto protocol; and (g) what are the penalties to which Canada would have been subject to under the Kyoto protocol for not meeting agreed emission reductions, and what analysis does the government possess in support of the statements that these penalties would have entailed “the loss of thousands of jobs” and “the transfer of $14 billion from Canadian taxpayers to other countries – the equivalent of $1600 from every Canadian family — with no impact on emissions or the environment” (statement by Minister Kent, Foyer of the House of Commons, December 12, 2011)? Q-4202 — 30 janvier 2012 — Mme Duncan (Etobicoke-Nord) — En ce qui concerne les engagements internationaux du Canada en matière de changement climatique et le retrait du Protocole de Kyoto par le gouvernement : a) pour chaque engagement international que le gouvernement a pris à propos des changements climatiques, (i) quel est l’engagement, (ii) quelles sont les obligations du gouvernement selon cet engagement, (iii) le gouvernement compte-t-il s’acquitter ou non de chaque obligation; b) quelles mesures précises ou positions de négociation ont été prises pour appuyer les déclarations du gouvernement selon lesquelles (i) « le Canada s’est rendu à Durban dans un esprit de bonne volonté », (ii) « [qu’en allant à la conférence sur les changements climatiques de Durban, il était] déterminé à faire des propositions constructives », (déclaration du ministre Kent, foyer de la Chambre des communes, le 12 décembre 2011); c) en détail, comment le gouvernement compte-t-il atteindre l’objectif de conclure un nouvel accord international sur les changements climatiques et plus particulièrement (i) comment le gouvernement prévoit-il respecter les engagements ayant force obligatoire pour tous les grands émetteurs, (ii) comment le gouvernement compte-t-il trouver des solutions pour atteindre l’objectif convenu de demeurer sous les 2°C de réchauffement; d) de quels renseignements le ministre de l’Environnement dispose-t-il pour appuyer sa déclaration selon laquelle « la position du Canada recueille de plus en plus d’appuis – de l’Union européenne en passant par les États-Unis, l’Australie, la Nouvelle-Zélande, des pays moins avancés et le groupe des 43 petits États insulaires » (déclaration du ministre Kent, foyer de la Chambre des communes, le 12 décembre 2011); e) le ministre de l’Environnement dispose-t-il d’informations qui portent à croire que le retrait du Canada du Protocole de Kyoto est une étape positive pour l’économie du Canada, contrairement aux coûts prévus par la Table ronde nationale sur l’environnement et l’économie qui sont de 21 à 43 milliards de dollars pas année d’ici 2050 (selon un scénario de faible changement climatique et de croissance lente ou un scénario de fort changement climatique et de croissance rapide), et quelles sont ces informations; f) quels sont, en détail, les « choix radicaux et irresponsables » (déclaration du ministre Kent, foyer de la Chambre des communes, le 12 décembre 2011) avec lesquels le Canada se trouvait aux prises en vertu du Protocole de Kyoto; g) quelles sont les pénalités auxquelles le Canada aurait été soumis pour ne pas avoir atteint les cibles convenues de réduction des émissions, et quelles analyses le gouvernement a-t-il en main pour appuyer les déclarations selon lesquelles ces pénalités auraient entraîné « la perte de milliers d’emplois » et « le transfert de 14 milliards de dollars provenant des poches des contribuables canadiens à d’autres pays – soit l’équivalent de 1 600 $ par famille canadienne, sans que cela n’ait aucune incidence sur les émissions ou sur l’environnement » (déclaration du ministre Kent, foyer de la Chambre des communes, le 12 décembre 2011)?
Q-4212 — January 30, 2012 — Ms. Duncan (Etobicoke North) — With respect to increasing evidence for the threat of climate change and Canada’s response to it, including emission reductions and adaptation strategies: (a) do the government’s policies address the growing scientific consensus that the threat of climate change is now incontrovertible; (b) do the government’s policies acknowledge that continuing on a business-as-usual pathway could lead to (i) a potential temperature rise of 4°C by the end of the century, (ii) dangerous impacts for Canada and the world; (c) do the government’s policies acknowledge that the small number of climate change deniers who continue to contest either that climate change is real or that humans are causing it (i) are generally not climate scientists, (ii) employ arguments that have been discredited by the international scientific community; (d) do the government’s policies acknowledge that (i) while our scientific understanding of the climate system is not complete, the evidence is sufficiently strong to show that climate change poses a real threat, (ii) further delays in addressing this threat will entail greater risks and costs; (e) do the government’s policies acknowledge that if the scenario in (b)(i) becomes a reality, serious consequences, such as coastal flooding, extreme weather events, and forest fires, will intensify over the coming decades with significant costs for the economy and the environment, both in Canada and globally; (f) what research, if any, has the government undertaken or planned to undertake to assess the impact of climate change on the Canadian economy and the costs of adaptation to climate change, and what are (i) the names of these studies, (ii) the dates they were carried out, (iii) their conclusions, including projected costs and whether and under what circumstances said costs can be kept to manageable levels, (iv) their recommendations; (g) what are specific examples of how the government is taking advantage of “shorter-term opportunities to address climate change” (notes for remarks by the Honourable Peter Kent, P.C., M.P., Announcement on Domestic Climate Change Adaptation, Toronto, Ontario, November 8, 2011); (h) what sectors are to be included in the government's sector-by-sector approach to climate change, and what are the dates for the inclusion of each sector; (i) what concrete examples demonstrate the government's climate change plan has "a strong, corresponding international component" (notes, November 8, 2011); (j) what, if any, (i) research, (ii) action, (iii) investment has the government carried out to “reduce the soot, methane, ozone and other gases” (notes, November 8, 2011) which are short-lived drivers of the climate system; (k) what research, if any, has the government undertaken to compare the costs of early mitigation of climate change with the costs of late adaptation to climate change, and what are (i) the names of these studies, (ii) the dates they were carried out, (iii) their conclusions, including projected costs and whether (and under what circumstances) said costs can be kept to manageable levels, (iv) their recommendations; (l) what, if any, (i) research, (ii) action, (iii) investment has the government carried out to develop a pan-Canadian plan for energy efficiency with targets for the years 2020, 2030, 2040, and 2050; (m) what, if any, (i) action, (ii) investment has the government undertaken to implement low-impact renewable energy solutions in Canada for the years listed in (l); (n) what, if any, (i) research, (ii) action, (iii) investment has the government undertaken to develop a strategy for sustainable transportation in Canada with targets for the years listed in (l); (o) what actions, if any, has the government carried out to develop a fund for climate-neutral pilot projects that will allow municipalities to reduce greenhouse gas (GHG) emissions as much as possible, and to use carbon offsets to neutralize unavoidable emissions; (p) what, if any, (i) research, (ii) action, (iii) investment has the government undertaken to develop a plan to rationalize and phase out fossil fuel subsidies, with targets for 2015, 2020 and 2025, in order to achieve the goal of a ‘medium term’ phase-out; (q) what, if any, (i) research, (ii) action, (iii) investment has the government undertaken to develop a plan to increase research and development into and deployment of low-carbon technology in Canada; (r) what, if any (i) research (ii) consultations has the government undertaken to determine if, given various possible scenarios, an investment of $148.8 million over the next five years will be sufficient to help Canada adapt adequately to climate change by the target dates 2030, 2040, and 2050; and (s) what specific provisions has the government made to allow Environment Canada’s Adaptation and Impacts Research Section to undertake research to help Canada adapt to climate change? Q-4212 — 30 janvier 2012 — Mme Duncan (Etobicoke-Nord) — En ce qui concerne la réalité de plus en plus solidement établie de la menace des changements climatiques et la réaction du Canada à cette menace, y compris les réductions d’émissions et les stratégies d’adaptation : a) les politiques gouvernementales tiennent-elles compte du consensus scientifique de plus en plus marqué que la menace des changements climatiques soit devenue indéniable; b) les politiques gouvernementales reconnaissent-elles que le scénario du maintien du statu quo pourrait déboucher sur (i) une augmentation de 4°C de la température d’ici la fin du siècle, (ii) des retombées dangereuses pour le Canada et le monde; c) les politiques gouvernementales reconnaissent-elles que le petit nombre de négateurs des changements climatiques qui continuent de contester la réalité des changements climatiques ou le rôle des êtres humains dans ces changements (i) ne sont pas des scientifiques en règle générale, (ii) présentent des arguments qui ont été discrédités par la communauté scientifique internationale; d) les politiques gouvernementales reconnaissent-elles que (i) tandis que la compréhension scientifique du changement climatique est incomplète, il existe suffisamment d’éléments de preuve qui illustrent que les changements climatiques constituent une véritable menace, (ii) que toute décision de reporter à plus tard la résolution de cette menace comporte de plus grands risques et coûts; e) les politiques gouvernementales reconnaissent-elles que si le scénario en b)(i) devient réalité, de graves conséquences, telles que des inondations côtières, des événements météorologiques extrêmes et des incendies de forêt, s’intensifieront au cours de la prochaine décennie et entraîneront des coûts énormes pour l’économie et l’environnement, tant au Canada qu’ailleurs dans le monde; f) quels travaux de recherche, s’il en est, le Canada a-t-il entrepris ou prévus pour évaluer l’impact des changements climatiques sur l’économie canadienne et les coûts de l’adaptation aux changements climatiques, et quels sont (i) les noms de ces études, (ii) les dates auxquelles elles ont été menées, (iii) leurs conclusions, notamment les projections des coûts, et dans quelles circonstances et dans quelle mesure lesdits coûts peuvent-ils être maintenus à des niveaux faciles à gérer, (iv) leurs recommandations; g) de quelles façons précises le gouvernement profite-t-il des « perspectives à court terme en matière de lutte contre les changements climatiques » (Notes d’allocution de l’honorable Peter Kent, c.p., député, Annonce concernant l’adaptation du pays aux changements climatiques, Toronto (Ontario), le 8 novembre 2011); h) quels secteurs sont inclus dans l’approche sectorielle du gouvernement en matière de changements climatiques, et quelles sont les dates auxquels chacun des ces secteurs seront inclus; i) quels exemples concrets indiquent que le plan du gouvernement en matière de changements climatiques comporte « un important volet international » (Notes, 8 novembre 2011); j) quels (i) travaux de recherche, (ii) mesures, (iii) investissements, s’il en est, le gouvernement a-t-il entrepris en vue de « réduire les particules de suie et les émissions d’autres gaz, dont le méthane et l’ozone » (Notes, 8 novembre 2011) qui sont des agents de forçage climatique à courte durée de vie; k) quels travaux de recherche, s’il en est, le gouvernement a-t-il entrepris en vue de comparer les coûts d’atténuation anticipée des changements climatiques aux coûts d’une adaptation tardive aux changements climatiques, et quels sont (i) les noms de ces études, (ii) les dates auxquelles elles ont été menées, (iii) leurs conclusions, notamment les projections des coûts, et dans quelles circonstances et dans quelle mesure lesdits coûts peuvent-ils être maintenus à des niveaux faciles à gérer, (iv) leurs recommandations; l) quels (i) travaux de recherche, (ii) mesures, (iii) investissements, s’il en est, le gouvernement a-t-il entrepris en vue d’élaborer un plan d’efficience énergétique pancanadien assorti de cibles pour les années 2020, 2030, 2040 et 2050; m) quels (i) mesures, (ii) investissements, s’il en est, le gouvernement a-t-il entrepris en vue d’adopter des solutions d’énergie renouvelable à faible impact environnemental au Canada pour les années mentionnées en l); n) quels (i) travaux de recherche, (ii) mesures, (iii) investissements, s’il en est, le gouvernement a-t-il entrepris en vue d’élaborer une stratégie en matière de transport durable au Canada assortie de cibles pour les années mentionnées en l); o) quelles mesures, s’il en est, le gouvernement a-t-il prises en vue de constituer un fonds pour les projets pilotes sur la neutralité climatique qui permettront aux municipalités de réduire les émissions de gaz à effet de serre (GES) le plus possible, et d’utiliser des crédits de compensation de carbone pour neutraliser les émissions inévitables; p) quels (i) travaux de recherche, (ii) mesures, (iii) investissements, s’il en est, le gouvernement a-t-il entrepris en vue d’élaborer un plan de rationalisation et d’élimination progressive du subventionnement des combustibles fossiles assorti de cibles pour les années 2015, 2020 et 2025, afin d’atteindre l’objectif d’une élimination à « moyen terme »; q) quels (i) travaux de recherche, (ii) mesures, (iii) investissements, s’il en est, le gouvernement a-t-il entrepris en vue d’élaborer un plan prévoyant accroître la recherche et le développement d’une technologie à faible teneur en carbone et de son application au Canada; r) quels (i) travaux de recherche (ii) consultations, s’il en est, le gouvernement a-t-il entrepris en vue de déterminer si, compte tenu des divers scénarios, un investissement de 148,8 millions de dollars au cours des cinq prochaines années suffira pour aider le Canada à s’adapter convenablement aux changements climatiques d’ici les dates cibles de 2030, 2040 et 2050; s) quelles dispositions particulières le gouvernement a-t-il prises pour autoriser la Section de la recherche sur l’adaptation et les répercussions d’Environnement Canada à mener des travaux de recherche pour aider le Canada à s’adapter aux changements climatiques?
Q-4222 — January 30, 2012 — Ms. Duncan (Etobicoke North) — With respect to nutrition in child and adolescent populations in Canada: (a) does government policy include recognition and acceptance of the principle that Canada’s children and adolescents are entitled to nutritious food (i) regardless of where they live, (ii) regardless of their family income, (iii) particularly when economic forces undermine efforts by parents and caregivers to ensure healthy eating; (b) given that the 1992 World Declaration on Nutrition, to which Canada was a signatory, states that access to nutritionally adequate and safe food is a right of each individual, what specific actions have the Canadian Institutes of Health Research (CIHR) and Health Canada undertaken for children and adolescents in order to fulfill this commitment; (c) what percentage of children and adolescents in Canada is food insecure, (i) do disparities exist, including, but not limited to, disability status, ethnicity, gender, geography, socio-economic status, (ii) if so, specify; (d) what percentage of children and adolescents lives below the poverty line, (i) do disparities exist, including, but not limited to, disability status, ethnicity, gender, geography, socio-economic status, (ii) if so, specify; (e) what percentage of children and adolescents has, as a result of living below the poverty line, (i) poor nutritional status, (ii) poor health outcomes due to their poor nutritional status; (f) what percentage of members of each of the following groups is food insecure, (i) child and adolescent newcomers, (ii) children and adolescents who live in poverty, (iii) children and adolescents who live in priority neighbourhoods, (iv) Aboriginal children and adolescents; (g) what percentage of children and adolescents (i) involuntarily misses meals, (ii) lacks healthy variety in its diet; (h) does the government have information, and, if so, what is that information, concerning (i) how (g)(i) and (g)(ii) impact the caloric and nutrient intake of young children, (ii) how (h)(i) affects growth and development and school readiness; (i) what percentage of child and adolescent newcomers, children and adolescents who live in poverty, children and adolescents who live in priority neighbourhoods, and Aboriginal children and adolescents (i) involuntarily misses meals, (ii) lacks healthy variety in its diet; (j) what percentage of children and adolescents has fewer than the recommended daily servings of (i) vegetables and fruit, (ii) milk products, (iii) grain products; (k) what percentage of child and adolescent newcomers, children and adolescents who live in poverty, children and adolescents who live in priority neighbourhoods, and Aboriginal children and adolescents has fewer than the recommended daily servings of (i) vegetables and fruit, (ii) milk products, (iii) grain products; (l) what percentage of children and adolescents from all income brackets is vulnerable to inadequate nutrition, (i) for what specific reasons; (m) what percentage of elementary students and secondary school students does not eat a nutritious breakfast before school, (i) do disparities exist, including, but not limited to, disability status, ethnicity, gender, geography, socio-economic status, (ii) if so, specify; (n) what percentage of children and adolescents is vulnerable to poor academic, health, and socio-emotional outcomes as a result of inadequate nutrition; (o) what percentage of overweight and obese children and adolescents does not eat a nutritious breakfast; (p) how are children’s learning capabilities (including, but not limited to, creativity testing, voluntary endurance, and working memory) affected by how recently a child has eaten; (q) how does malnutrition in early life limit long-term intellectual development; (r) what impact, if any, does an inadequate childhood diet have on the risk of adult chronic disease; (s) how is the behaviour of children and adolescents (including, but not limited to, ability to concentrate, anxiety, depression, fatigue, and irritability) affected by whether or not they have eaten breakfast; (t) what research, if any, has the CIHR or Health Canada undertaken to assess whether schools play a role in shaping the dietary behaviours of children, and, if such research has been undertaken, (i) what are the studies, (ii) what are the studies’ dates, (iii) what are the studies’ conclusions, (iv) what are the studies’ recommendations; (u) what research, if any, has the CIHR or Health Canada undertaken to assess possible links between student nutrition and academic performance, classroom behaviour, and antisocial behaviour, and, if such research has been undertaken, (i) what are the studies, (ii) what are the studies’ dates, (iii) what are the studies’ conclusions, (iv) what are the studies’ recommendations; (v) what research, if any, has the CIHR or Health Canada undertaken to assess whether nutrition programs delivered at school sites are effective in providing children with (i) more nutritious diets, (ii) better cognitive abilities, (iii) better cooperation among children, (iv) improved discipline, (v) improved interpersonal behaviours, (vi) improved emotional and physical health, (vii) reduced risk of chronic disease, and, if such research has been undertaken, (viii) what are the studies, (ix) what are the studies’ dates, (x) what are the studies’ conclusions, (xi) what are the studies’ recommendations; (w) what research, if any, has the CIHR or Health Canada undertaken to assess whether nutrition programs delivered at school sites improve (i) nutritional adequacy, (ii) nutritional education, (iii) positive socialization, (iv) school attendance, (v) community mobilization, partnerships and social support, and, if such research has been undertaken, (vi) what are all the studies, (vii) what are the studies’ dates, (viii) what are the studies’ conclusions, (ix) what are the studies’ recommendations; (x) what percentage of children and adolescents is enrolled in a school district with (i) a nutrition program, (ii) nutritional guidelines for school meals; (y) what percentage of child and adolescent newcomers, children and adolescents who live in poverty, children and adolescents who live in priority neighbourhoods, and Aboriginal children and adolescents, is enrolled in a school district with (i) a nutrition program, (ii) nutritional guidelines for school meals; (z) what information does the government possess that explains why school sites are an effective venue to deliver student nutrition and what is this information; (aa) are there specific reasons why Canada does not have a pan-Canadian nutritional initiative delivered at school sites, and, if so, (i) what are these reasons, (ii) does the government have any analysis of the obstacles that would have to be overcome to develop a pan-Canadian nutrition program and what are those obstacles; (bb) what research, if any, has been undertaken by the CIHR or the government into a pan-Canadian nutrition initiative to be delivered at school sites, including (i) the cost per student per day, (ii) the annual return on investment of a pan-Canadian nutrition initiative delivered at school sites, (iii) the annual payback on a pan-Canadian nutrition initiative if the graduation rate increased by five percent, (iv) the annual return on investment of a pan-Canadian nutrition initiative if obesity, cardiopulmonary, and diabetes rates were reduced by five percent as a result of the initiative; (cc) what research, if any, has been undertaken by the CIHR or the government into fully funding on-reserve aboriginal student meals, including (i) the cost per student per day, (ii) the annual return on investment of a student nutrition initiative, (iii) the annual payback on a student nutrition initiative if the graduation rate increased by five percent, (iv) the annual payback on a student nutrition initiative if obesity, cardiopulmonary, and diabetes rates were reduced by five percent as a result of the initiative; (dd) has the government taken any action or made any investment, and, if so, what is the nature of said action or investment, to (i) initiate discussions with the provincial and territorial ministers responsible for agriculture, education and health to develop a comprehensive pan-Canadian school nutrition initiative, (ii) fully fund on-reserve aboriginal student meals; and (ee) what research, if any, has been undertaken by Agriculture and Agri-Food Canada, and what economic impacts on the Canadian economy have been identified in said research, into (i) a possible economic stimulus resulting from the implementation of a pan-Canadian nutrition initiative delivered at school sites, including, but not limited to, the impacts on ancillary industries, such as, distribution, refrigeration, and service, (ii) the development of local markets for farmers? Q-4222 — 30 janvier 2012 — Mme Duncan (Etobicoke-Nord) — En ce qui concerne la nutrition chez les enfants et les adolescents au Canada : a) la politique du gouvernement prévoit-elle la reconnaissance et l’acceptation du principe voulant que les enfants et les adolescents canadiens ont droit à des aliments nutritifs (i) peu importe l’endroit où ils vivent, (ii) peu importe leur revenu familial, (iii) particulièrement lorsque des forces économiques entravent les efforts des parents pour assurer de saines habitudes alimentaires; b) compte tenu du fait que la Déclaration mondiale sur la nutrition de 1992, dont le Canada est signataire, stipule que l’accès à des aliments nutritionnellement appropriés et sans danger est un droit universel, quelles mesures précises relatives aux enfants et aux adolescents les Instituts de recherche en santé du Canada (IRSC) et Santé Canada ont ils prises afin de respecter cet engagement; c) au Canada, quel pourcentage des enfants et des adolescents est touché par l’insécurité alimentaire, (i) existe-t-il des écarts qui sont liés, entre autres, à l’existence d’un handicap, à l’origine ethnique, au sexe, à la géographie, à la situation socio-économique, (ii) si tel est le cas, précisez; d) quel pourcentage des enfants et des adolescents vit sous le seuil de la pauvreté, (i) existe-il des écarts qui sont liés, entre autres, à l’existence d’un handicap, à l’origine ethnique, au sexe, à la géographie, à la situation socio-économique (ii) si tel est le cas, précisez; e) quel pourcentage des enfants et des adolescents a, parce qu’il vit sous le seuil de la pauvreté, (i) un mauvais état nutritionnel, (ii) est en mauvaise santé en raison de son mauvais état nutritionnel; f) quel pourcentage des membres de chacun des groupes suivants est touché par l’insécurité alimentaire, (i) enfants et adolescents nouvellement arrivés, (ii) enfants et adolescents vivant dans la pauvreté, (iii) enfants et adolescents vivant dans des quartiers prioritaires, (iv) enfants et adolescents autochtones; g) quel pourcentage des enfants et des adolescents (i) saute involontairement des repas, (ii) a une alimentation qui n’est pas suffisamment variée; h) le gouvernement a-t-il des renseignements, et quels sont-ils, sur (i) la façon dont g)(i) et g)(ii) touche l’apport calorique et nutritif des jeunes enfants, (ii) la façon dont h)(i) touche la croissance et de développement ainsi que la préparation scolaire; i) quel pourcentage des enfants et des adolescents nouvellement arrivés, des enfants et des adolescents vivant dans la pauvreté, des enfants et des adolescents vivant dans des quartiers prioritaires et des enfants et des adolescents autochtones (i) saute involontairement des repas, (ii) a une alimentation qui n’est pas suffisamment variée; j) quel pourcentage des enfants et des adolescents a moins que les portions quotidiennes recommandées de (i) fruits et légumes, (ii) produits laitiers, (iii) produits céréaliers; k) quel pourcentage des enfants et des adolescents nouvellement arrivés, des enfants et des adolescents vivant dans la pauvreté, des enfants et des adolescents vivant dans des quartiers prioritaires et des enfants et des adolescents autochtones a moins que les portions quotidiennes recommandées de (i) fruits et légumes, (ii) produits laitiers, (iii) produits céréaliers; l) quel pourcentage des enfants et des adolescents de toutes les tranches de revenus est sujet à une alimentation déficiente, (i) pour quelles raisons précises; m) quel pourcentage des élèves du primaire et du secondaire ne mange pas un petit déjeuner nourrissant avant les classes, (i) existe-il des écarts qui sont liés, entre autres, à l’existence d’un handicap, à l’origine ethnique, au sexe, à la géographie, à la situation socio-économique, (ii) si tel est le cas, précisez; n) quel pourcentage des enfants et des adolescents est sujet à des difficultés en ce qui concerne les études, la santé et les rapports socio-affectifs en raison d’une alimentation inappropriée; o) quel pourcentage des enfants et des adolescents qui souffrent d’embonpoint et d’obésité ne mange pas un petit déjeuner nourrissant; p) en quoi les capacités d’apprentissage d’un enfant (dont les épreuves de créativité, l’endurance volontaire et la mémoire de travail) sont-elles touchées par le temps écoulé depuis son dernier repas; q) en quoi la malnutrition dans la petite enfance limite-t-elle le développement intellectuel à long terme; r) le cas échant, quelle incidence une alimentation inappropriée dans l’enfance a-t-elle sur les risques de maladies chroniques à l’âge adulte; s) en quoi le comportement des enfants et des adolescents (dont la capacité de concentration, l’anxiété, la fatigue et l’irritabilité) est-il touché par le fait d’avoir ou de ne pas avoir pris de petit déjeuner; t) le cas échéant, quelles recherches les IRSC ou Santé Canada ont-ils menées afin d’établir si l’école joue un rôle dans la détermination des comportements alimentaires des enfants, et, si de telles études existent, (i) quelles sont-elles, (ii) quelles en sont les dates, (iii) quelles en sont les conclusions, (iv) quelles en sont les recommandations; u) le cas échéant, quelles recherches les IRSC ou Santé Canada ont-ils menées afin d’évaluer les liens possibles entre l’alimentation des élèves et le rendement scolaire, le comportement en classe et les comportements antisociaux, et, si de telles études existent, (i) quelles sont-elles, (ii) quelles en sont les dates, (iii) quelles en sont les conclusions, (iv) quelles en sont les recommandations; v) le cas échéant, quelles recherches les IRSC ou Santé Canada ont-ils menées afin d’évaluer si les programmes alimentaires offerts dans les écoles sont efficaces pour ce qui est de favoriser chez les enfants (i) une alimentation plus nutritive, (ii) de meilleures capacités cognitives (iii) une meilleure collaboration entre les enfants, (iv) une amélioration de la discipline, (v) une amélioration des comportements interpersonnels, (vi) une amélioration de la santé affective et physique, (vii) une réduction des maladies chroniques, et, si de telles études existent, (i) quelles sont-elles, (ii) quelles en sont les dates, (iii) quelles en sont les conclusions, (iv) quelles en sont les recommandations; w) le cas échéant, quelles recherches les IRSC ou Santé Canada ont-ils menées afin d’évaluer si les programmes alimentaires offerts dans les écoles améliorent (i) la suffisance nutritionnelle, (ii) l’éducation alimentaire, (iii) la socialisation positive, (iv) l’assiduité scolaire, (v) la mobilisation communautaire, les partenariats et le soutien social et, si de telles études existent, (i) quelles sont-elles, (ii) quelles en sont les dates, (iii) quelles en sont les conclusions, (iv) quelles en sont les recommandations; x) quel pourcentage des enfants et des adolescents est inscrit dans un arrondissement scolaire offrant (i) un programme alimentaire, (ii) des lignes directrices alimentaires pour les repas à l’école; y) quel pourcentage des enfants et des adolescents nouvellement arrivés, des enfants et des adolescents vivant dans la pauvreté, des enfants et des adolescents vivant dans des quartiers prioritaires et des enfants et des adolescents autochtones est inscrit dans un arrondissement scolaire offrant (i) un programme alimentaire, (ii) des lignes directrices alimentaires pour les repas à l’école; z) quels renseignements le gouvernement a-t-il pour expliquer pourquoi les écoles constituent un lieu efficace pour offrir des services alimentaires aux élèves et quels sont ces renseignements; aa) existe-t-il des raisons particulières pour lesquelles le Canada n’a pas d’initiative alimentaire pancanadienne dans les écoles et, le cas échant (i) quelles sont ces raisons, (ii) le gouvernement a-t-il mené des analyses sur les obstacles que l’on devrait surmonter afin d’élaborer un programme alimentaire pancanadien et quels sont ces obstacles; bb) le cas échéant, quelles recherches les IRSC ou le gouvernement ont-ils menées sur une initiative alimentaire pancanadienne à mettre en œuvre dans les écoles, y compris (i) sur le coût quotidien par élève, (ii) le rendement annuel des investissements relatifs à une initiative alimentaire pancanadienne dans les écoles, (iii) sur les retombées annuelles d’une initiative alimentaire pancanadienne si le taux d'obtention de diplôme augmente de 5 %, (iv) sur le rendement annuel des investissements relatifs à une initiative alimentaire pancanadienne si les taux d’obésité, de troubles cardio-pulmonaires et de diabète diminuaient de 5 % en raison de l’initiative; cc) le cas échéant, quelles recherches les IRSC ou le gouvernement ont-ils menées sur le financement intégral des repas aux élèves autochtones dans les réserves, y compris (i) sur le coût quotidien par élève, (ii) le rendement annuel des investissements relatifs à une initiative alimentaire pour les élèves, (iii) sur les retombées annuelles d’une initiative alimentaire pour les élèves si le taux d'obtention de diplôme augmente de 5 %, (iv) sur les retombées annuelles d’une initiative alimentaire pour les élèves si les taux d’obésité, de troubles cardio-pulmonaires et de diabète diminuaient de 5 % en raison de l’initiative; dd) le gouvernement a-t-il pris des mesures ou a-t-il effectué des investissements, et, le cas échéant, quel en est la nature, pour (i) entreprendre des discussions avec les ministres provinciaux et territoriaux responsables de l’agriculture, de l’éducation et de la santé en vue d’élaborer une initiative alimentaire pancanadienne complète dans les écoles, (ii) de financer intégralement les repas aux élèves autochtones dans les réserves; ee) le cas échant, quelles recherches Agriculture et Agroalimentaire Canada a-t-il menées, et quelles retombées économiques ont été déterminées dans lesdites recherches, sur (i) une possible stimulation économique résultant de la mise en œuvre d’une initiative alimentaire pancanadienne dans les écoles, dont, les effets sur les industries auxiliaires, telles que la distribution, la réfrigération et les services, (ii) le développement de marchés locaux pour les agriculteurs?
Q-4232 — January 30, 2012 — Ms. Borg (Terrebonne—Blainville) — With regard to the report of the Standing Committee on Health presented to the House on December 2, 2010, entitled “An Examination of the Potential Health Impacts of Radiofrequency Electromagnetic Radiation”: (a) which of the recommendations presented in this report does the Minister of Health plan to implement; (b) when does she plan to do so; and (c) if she is not planning to implement them, why? Q-4232 — 30 janvier 2012 — Mme Borg (Terrebonne—Blainville) — En ce qui concerne le rapport du Comité permanent de la santé présenté à la Chambre le 2 décembre 2010 et intitulé « Examen des effets possibles sur la santé du rayonnement électromagnétique de radiofréquences » : a) lesquelles des recommandations présentées dans ledit rapport la ministre de la Santé prévoit-elle appliquer; b) quand prévoit-elle le faire; c) si elle ne prévoit pas les appliquer, pourquoi?
Q-4242 — January 31, 2012 — Mr. LeBlanc (Beauséjour) — With regard to all expenditures between $8,000 and $10,000 by the Atlantic Canada Opportunities Agency since January 1, 2006, what are the details of these expenditures broken down by (i) the names of the people or organizations to whom payments were made, (ii) the amounts of the payments per recipient, (iii) the dates the payments were issued, (iv) the description of the purpose of each expenditure? Q-4242 — 31 janvier 2012 — M. LeBlanc (Beauséjour) — En ce qui concerne toutes les dépenses entre 8 000 $ et 10 000 $ effectuées par l’Agence de promotion économique du Canada atlantique depuis le 1er janvier 2006, quels sont les détails de ces dépenses, classés par (i) le nom des personnes ou des entreprises à qui les paiements ont été versés, (ii) les montants des paiements par destinataire, (iii) les dates auxquelles les paiements ont été émis, (iv) la description du but de chaque dépense?
Q-4252 — January 31, 2012 — Mr. LeBlanc (Beauséjour) — With regard to the Canada Post Corporation (CPC) and its employment of President and CEO, Deepak Chopra and Group Presidents, Jacques Côté and Kerry Munro: (a) what does the CPC provide each individual in terms of (i) salary range, (ii) vehicle allowance or provision of car or driver, (iii) expense account for food, drink, alcohol and hospitality, (iv) out-of-town accommodations for the individual; (b) in each of the years between 2009 and 2011, how much did each of these individuals expense to the CPC for (i) food, (ii) travel, (iii) hotels, (iv) hospitality, (v) drinks/alcohol, (vi) vehicle use; (c) what were the itemized amounts and descriptions of each individual’s individual expenses as identified in the answers to (b); and (d) if the CPC provides any of these individuals with a vehicle for his use, as identified in the answers to (a)(ii), broken down by individual, (i) what is the model and make of the car, (ii) how much does this benefit cost the CPC on an annual basis? Q-4252 — 31 janvier 2012 — M. LeBlanc (Beauséjour) — En ce qui concerne la Société canadienne des postes (SCP) et l’embauche du président-directeur général, Deepak Chopra, et des présidents de groupe, Jacques Côté et Kerry Munro : a) quels avantages sociaux la SCP fournit-elle à chacun relativement à (i) l’échelle salariale, (ii) l’allocation pour frais d’automobile ou la fourniture d’un véhicule ou d’un chauffeur, (iii) un compte de dépenses pour la nourriture, les boissons, l’alcool et l’hospitalité, (iv) l’hébergement quand ils voyagent; b) pour chaque année entre 2009 et 2011, à combien s’élèvent les frais que ces personnes ont réclamés à la SCP pour (i) la nourriture, (ii) les déplacements, (iii) les hôtels, (iv) l’hospitalité, (v) les boissons/l’alcool, (vi) l’utilisation d’un véhicule; c) quelle est la description détaillée et à combien s’élève le montant total des frais individuels de chacun à l’égard de la réponse fournie en b); d) si la SCP fournit un véhicule à l’une ou l’autre de ces personnes pour son usage, selon la réponse fournie en a)(ii), ventilé par personne, (i) quel est le modèle et la marque de voiture, (ii) combien coûte cet avantage annuellement à la SCP?
Q-4262 — January 31, 2012 — Mr. LeBlanc (Beauséjour) — With regard to all expenditures between $8,000 and $10,000 by the Department of Foreign Affairs and International Trade Canada since January 1, 2006, excluding grants and contributions, what are the details of these expenditures categorized by (i) the names of the people or organizations to whom the payments were made, (ii) the amounts of the payments per recipient, (iii) the dates the payments were issued, (iv) the description of the purpose of each expenditure? Q-4262 — 31 janvier 2012 — M. LeBlanc (Beauséjour) — En ce qui concerne toutes les dépenses entre 8 000 $ et 10 000 $ effectuées par le ministère des Affaires étrangères et du Commerce international du Canada depuis le 1er janvier 2006, à l’exception des subventions et des contributions, quels sont les détails de ces dépenses, classés par (i) le nom des personnes ou des entreprises à qui les paiements ont été versés, (ii) les montants des paiements par destinataire, (iii) les dates auxquelles les paiements ont été émis, (iv) la description du but de chaque dépense?
Q-4272 — January 31, 2012 — Mr. LeBlanc (Beauséjour) — With respect to Canada’s liability as a financing member of the European Bank for Reconstruction and Development (EBRD): (a) what is the amount of Canada’s unfunded liability; (b) what is the total amount of Canada’s liability; and (c) what are the amounts of unfunded and total liability for other financing members of the EBRD, broken down by member? Q-4272 — 31 janvier 2012 — M. LeBlanc (Beauséjour) — En ce qui concerne la dette du Canada en tant qu’actionnaire de la Banque européenne pour la reconstruction et le développement (BERD) : a) quel est le montant de la dette non provisionnée du Canada; b) quel est le total des dettes du Canada; c) quels sont les montants de la dette non provisionnée et du total des dettes de chaque autre actionnaire de la BERD?
Q-4282 — January 31, 2012 — Mr. McCallum (Markham—Unionville) — With regard to the government’s expenditure plan, by year for fiscal years 2006-2007, 2007-2008, 2008-2009, 2009-2010, 2010-2011 and 2011-2012, what are the comprehensive details of all government spending on statutory items not included in the Main Estimates or any Supplementary Estimates, including: (a) the department expending the funds, (b) the amount spent; (c) the legislative authority for the spending; (d) the purpose of the spending; and (e) the reason why the item was excluded from the Estimates? Q-4282 — 31 janvier 2012 — M. McCallum (Markham—Unionville) — En ce qui concerne le plan de dépenses du gouvernement, pour chacun des exercices 2006-2007, 2007-2008, 2008-2009, 2009-2010, 2010-2011 et 2011-2012, quels sont les détails de toutes les dépenses gouvernementales imputées à des postes législatifs qui ne figurent ni au Budget principal des dépenses ni aux budgets supplémentaires des dépenses, y compris : a) le ministère qui dépense les fonds; b) le montant dépensé; c) l’autorité législative responsable de la dépense; d) l’objet de la dépense; e) la raison pour laquelle la dépense a été exclue du Budget?
Q-4292 — January 31, 2012 — Mr. McCallum (Markham—Unionville) — With regard to government communications, what is the number, by department, of non-exempt staff (i.e., departmental staff and non-political staff within the office of a Minister or Minister of State) who prepare in whole or in part: (a) for Ministers and Parliamentary Secretaries, (i) responses for question period, (ii) talking points/media lines, (iii) speaking notes for debates, (iv) speaking notes for public events; and (b) for backbench government Members of Parliament, (i) question period questions, (ii) talking points/media lines, (iii) speeches for public events, (iv) speeches for debates in Parliament, (v) written notes for public events, (vi) written notes for Members’ statements under Standing Order 31? Q-4292 — 31 janvier 2012 — M. McCallum (Markham—Unionville) — En ce qui concerne les communications du gouvernement, par ministère, combien d’employés non exonérés (c.-à-d. les employés ministériels et non politiques du cabinet d’un ministre ou d’un ministre d’État) préparent, en tout ou en partie : a) pour des ministres ou des secrétaires parlementaires, (i) des réponses pour la période des questions, (ii) des sujets d’entretien ou des infocapsules, (iii) des notes d’allocution en vue de débats, (iv) des notes d’allocution en vue d’activités publiques; b) pour des députés d'arrière-ban du gouvernement, (i) des questions pour la période des questions, (ii) des sujets d’entretien ou des infocapsules, (iii) des allocutions en vue d’activités publiques, (iv) des allocutions en vue de débats au Parlement, (v) des notes écrites en vue d’activités publiques, (vi) des notes écrites en vue de déclarations de députés en vertu de l'article 31 du Règlement?
Q-4302 — January 31, 2012 — Ms. Borg (Terrebonne—Blainville) — With regard to the impending “lawful access” legislation, (a) has the Minister of Public Safety identified any cases where online privacy legislation has hindered police investigations and threatened public safety; and (b) has the Minister of Public Safety made any statements concerning the second call-out in three years by the Canadian Association of Police Chiefs to police departments across the country to submit cases where the refusal by an Internet Service Provider to provide the personal information of a customer has “hindered an investigation or threatened public safety” and, if so, what is the content of these statements? Q-4302 — 31 janvier 2012 — Mme Borg (Terrebonne—Blainville) — En ce qui concerne le projet de loi imminent sur l’accès juridique : a) le ministre de la Sécurité publique a-t-il répertorié des cas où une loi sur la protection de la vie privée en ligne avait nui aux enquêtes policières et menacé la sécurité publique; b) le ministre de la Sécurité publique a-t-il fait des déclarations concernant la deuxième requête en trois ans formulée par l’Association canadienne des chefs de police aux services de police au pays de lui faire part de cas où le refus par un fournisseur de service Internet de fournir les renseignements personnels d’un client a « nuit à une enquête ou menacé la sécurité publique » et, si oui, quelle est la teneur de ces déclarations?
Q-4312 — January 31, 2012 — Ms. Chow (Trinity—Spadina) — With regard to Canadian bridges, since 2005: (a) how many incidents have there been of concrete, or other large debris, breaking and falling from bridges (i) nationally, (ii) broken down by municipality; (b) what are the details of each incident of concrete, or other large debris, breaking and falling from Canadian bridges, including (i) the size of the debris, (ii) the damages reported as a result of the falling debris, (iii) the injuries or fatalities reported, (iv) the date and location of the incident, (v) the economic impact caused by the resulting road closure; and (c) what plans does the government have to prevent future incidents of concrete falling from Canadian bridges? Q-4312 — 31 janvier 2012 — Mme Chow (Trinity—Spadina) — En ce qui concerne les ponts au Canada, depuis 2005 : a) combien y a-t-il eu d’incidents mettant en cause des débris de béton ou d’autres débris lourds s’étant détachés d’un pont (i) au pays, (ii) dans chaque municipalité; b) quels sont les détails de chaque incident mettant en cause des débris de béton ou d’autres débris lourds s’étant détachés d’un pont au Canada, en précisant (i) la taille des débris, (ii) les dommages causés par les débris s’étant détachés du pont, (iii) les blessures ou les décès causés, (iv) la date et le lieu de l’incident, (v) les répercussions économiques entraînées par la fermeture subséquente de rues; c) quels sont les plans du gouvernement pour éviter que de telles situations se reproduisent?
Q-4322 — January 31, 2012 — Ms. Chow (Trinity—Spadina) — With regard to air safety: (a) how many inspections were done each year from 2004 to 2011, broken down by (i) audits, (ii) traditional inspections, (iii) process validation inspections, (iv) companies; (b) how many employees are conducting such audits and what is their profession (e.g., pilots, mechanics, other technicians); (c) what is the number of companies found to be in violation of air safety regulations and the number of enforcement actions as a result, broken down by company; and (d) what is the number of enforcement actions from inspections abandoned following the introduction of the Safety Management System, broken down by company? Q-4322 — 31 janvier 2012 — Mme Chow (Trinity—Spadina) — En ce qui a trait à la sécurité aérienne : a) combien d’inspections ont été faites chaque année de 2004 à 2011, ventilées par (i) vérifications, (ii) inspections traditionnelles, (iii) inspections de validation des procédés, (iv) compagnie; b) combien d’employés effectuent ces vérifications et quelle est leur profession (c.-à-d. pilote, mécanicien, autres techniciens); c) combien de compagnies ont contrevenu à la réglementation sur la sécurité aérienne et combien de mesures disciplinaires ont été prises en conséquence, ventilées par compagnie; d) combien de mesures disciplinaires liées à l’abandon d’inspections par suite de l’instauration du Système de gestion de la sécurité ont été prises, ventilées par compagnie?
Q-433 — February 1, 2012 — Mr. Pilon (Laval—Les Îles) — With regard to the construction of a new arena in Laval: (a) can the Minister of Transport, Infrastructure and Communities confirm that, if the project submitted is the same apart from the number of seats in the arena (10,000 instead of 7,000), the government will contribute the same level of funding announced in 2009; and (b) what are the rules and criteria for obtaining federal funding for the construction of public sports facilities? Q-433 — 1er février 2012 — M. Pilon (Laval—Les Îles) — En ce qui concerne la construction d’un nouvel amphithéâtre à Laval : a) le ministre des Transports, de l’Infrastructure et des Collectivités peut-il confirmer que si le projet déposé est le même à la différence du nombre de sièges dans l’enceinte principale (10 000 au lieu de 7 000), le gouvernement contribuera à la mesure du montant initial annoncé en 2009; b) quels sont les règles et les critères liés à l’obtention d’un financement fédéral pour la construction d’infrastructures publiques à vocation sportive?
Q-4342 — February 1, 2012 — Mr. Kellway (Beaches—East York) — With regard to the next generation fighter aircraft capability: (a) what is (i) the exact number of requirements, (ii) the exact wording of the specific requirements that can only be met by the F-35A; (b) has the government received written confirmation from other major jet suppliers, including Boeing, Saab or Dassault, indicating that the requirements outlined in (a)(ii) will not be met by 2020, and, if so, what are the dates of the correspondence; (c) does the F-35A currently meet the requirements outlined in (a)(ii); and (d) can the F-35A meet all the requirements for Canada’s next generation fighter aircraft by 2020? Q-4342 — 1er février 2012 — M. Kellway (Beaches—East York) — En ce qui concerne la capacité du chasseur de la prochaine génération : a) quel est (i) le nombre exact d’exigences, (ii) le libellé exact des exigences particulières auxquelles seul le F-35A satisfait; b) le gouvernement a-t-il reçu une confirmation écrite d’autres grands fournisseurs d’avions à réaction, dont Boeing, Saab ou Dassault, indiquant que les exigences énoncées au point a)(ii) ne pourront pas être comblées d’ici 2020 et, dans l’affirmative, quelles sont les dates de la correspondance; c) le F-35A satisfait-il actuellement aux exigences du point a)(ii); d) le F-35A peut-il satisfaire à toutes les exigences établies pour le chasseur de la prochaine génération d’ici 2020?
Q-4352 — February 1, 2012 — Mr. Casey (Charlottetown) — With regard to translation services: (a) how many contracts were entered into since January 1, 2011, for translation from a non-official language into an official language by (i) the Privy Council Office, (ii) the Prime Minister’s Office, (iii) the Office of the Minister of Intergovernmental Affairs, (iv) the Office of the Minister of Citizenship and Immigration, (v) the Department of Citizenship and Immigration; and (b) for each contract, what was the (i) cost, (ii) duration, (iii) scope, (iv) translation service provider, (v) source language, (vi) target language? Q-4352 — 1er février 2012 — M. Casey (Charlottetown) — En ce qui concerne les services de traduction : a) combien de contrats ont été conclus depuis le 1er janvier 2011 pour de la traduction d’une langue non officielle vers une langue officielle par (i) le Bureau du Conseil privé, (ii) le Cabinet du premier ministre, (iii) le bureau du ministre des Affaires intergouvernementales, (iv) le bureau du ministre de la Citoyenneté et de l’Immigration, (v) le ministère de la Citoyenneté et de l’Immigration; b) pour chaque contrat, quels étaient (i) le coût, (ii) la durée, (iii) la portée, (iv) le fournisseur du service de traduction, (v) la langue de départ, (vi) la langue d’arrivée?
Q-4362 — February 1, 2012 — Mr. Casey (Charlottetown) — With respect to the television advertisements “Our Veterans Matter”, “The Pride of Our Country”, “Veterans’ Week Vignette”, and other 2011 Veterans’ Week television spots: (a) how many different advertisements were produced or used to promote Veterans’ Week in 2011; (b) what was the total cost (production, airtime, etc.) for the advertisements in (a); (c) what was the cost to produce the television spots, broken down individually by advertisement; (d) what company or companies produced the advertisements, broken down individually by advertisement; (e) what was the cost of television airtime for the advertisements, broken down individually by advertisement; (f) on which television channels were the advertisements aired; (g) what was the cost of online airtime for the advertisements, broken down individually by advertisement; (h) on which online platforms were the advertisements aired, broken down by free media (e.g., posting to YouTube) and fee media (e.g., online commercials); and (i) which programs or divisions of Veterans Affairs Canada were responsible for (i) overseeing/coordinating production of the advertisements, (ii) financing the production of the advertisements, (iii) financing the purchase of airtime both on television and online? Q-4362 — 1er février 2012 — M. Casey (Charlottetown) — En ce qui concerne les messages publicitaires à la télévision « Nos vétérans le méritent », « La fierté de notre pays », « Capsules commémoratives », et autres messages diffusés pendant la Semaine des anciens combattants en 2011 : a) combien de messages publicitaires différents ont été produits ou utilisés pour faire la promotion de la Semaine des vétérans en 2011; b) quel a été le coût total (production, temps d’antenne, etc.) de ces messages publicitaires mentionnés en a); c) quel a été le coût de production des messages télévisés, pour chacun d’eux; d) quelle entreprise ou quelles entreprises ont produit chacun de ces messages publicitaires; e) quel a été le coût du temps d’antenne pour chacun de ces messages; f) quelles chaînes de télévision ont diffusé ces messages; g) quel a été le coût de diffusion en ligne de chacun de ces messages; h) quelles plateformes en ligne ont diffusé ces messages, ventilées selon qu’elles appartiennent aux médias gratuits (comme sur YouTube) ou payants (comme les publicités en ligne); i) quels programmes ou divisions d’Anciens Combattants Canada étaient responsables de (i) surveiller ou coordonner la production des messages publicitaires, (ii) de financer la production des messages publicitaires, (iii) de financer l’achat de temps de diffusion tant à la télévision qu’en ligne?
Q-4372 — February 3, 2012 — Mr. Toone (Gaspésie—Îles-de-la-Madeleine) — With regard to Exploration License No. 1105 (as amended on November 23, 2011) of Corridor Resources Inc., issued by the Canada-Newfoundland and Labrador Offshore Petroleum Board: (a) what are the reasons for the two-year extension of Period 1 from five years to seven years (Fundamental Decision 2011.05); (b) what is the total amount of license rental fees that Corridor Resources would have paid during Period 2 before the November 23, 2011, amendment; (c) what is the total amount that Corridor Resources will pay in license rental fees after the amendment; (d) what are the reasons for amending License No. 1105 so that no deposit was required to extend Period 1; (e) has Corridor Resources ever posted a $1 million deposit under License No. 1105; and (f) has Corridor Resources posted deposits for any amount under License No. 1105, either before or after it was amended? Q-4372 — 3 février 2012 — M. Toone (Gaspésie—Îles-de-la-Madeleine) — En ce qui concerne la licence d’exploration no 1105 (modifiée le 23 novembre 2011) de Corridor Resources inc., délivrée par l’Office Canada-Terre-Neuve-et-Labrador des hydrocarbures extracôtiers : a) pour quelles raisons a-t-on prolongé de deux ans la période 1, la faisant ainsi passer de cinq ans à sept ans (décision 2011.05); b) quel est le montant total en frais de location de licence que Corridor Resources inc. aurait payé pendant la période 2 avant la modification du 23 novembre 2011; c) quel est le montant total en frais de location de licence que Corridor Resources paiera après la modification; d) pour quelles raisons a-t-on modifié la licence no 1105 sans exiger un dépôt de garantie pour la prolongation de la période 1; e) Corridor Resources inc. a-t-elle déjà versé le dépôt de garantie d’un million de dollars requis pour la licence no 1105; f) Corridor Resources inc. a-t-elle versé des dépôts de garantie quelconques pour la licence no 1105 avant ou après la modification de celle-ci?
Q-4382 — February 3, 2012 — Mr. Andrews (Avalon) — With regard to the Department of Fisheries and Oceans and, more specifically, Small Craft Harbours (SCH), how many properties under the ownership of SCH have been divested each year from 2006-2011 inclusively, (i) in what community and province were each of these properties located, (ii) what was the assessed value of each of these properties at the time of divestiture, (iii) what financial transactions took place (i.e., amounts), as part of the Divestiture of Non-Core Harbours program, (iv) who received financial compensation and/or paid financial compensation for the divested properties? Q-4382 — 3 février 2012 — M. Andrews (Avalon) — En ce qui concerne le ministère des Pêches et des Océans et, notamment, Ports pour petits bateaux (PPB), combien de propriétés appartenant à PPB ont été cédées chaque année de 2006 à 2011, inclusivement, (i) dans quelle agglomération et dans quelle province était située chacune de ces propriétés, (ii) quelle était la valeur estimée de chacune de ces propriétés au moment de sa cession, (iii) quelles transactions financières ont eu lieu (c.-à-d. les montants), dans le cadre du programme de dessaisissement de ports pour petits bateaux non-essentiels, (iv) qui a reçu une compensation financière et/ou versé une compensation financière pour les propriétés cédées?
Q-4392 — February 3, 2012 — Mrs. Sellah (Saint-Bruno—Saint-Hubert) — What is the amount of spending by the federal government in the riding of Saint-Bruno—Saint-Hubert since fiscal year 2004-2005 to today (i) by department or agency, (ii) by program or initiative? Q-4392 — 3 février 2012 — Mme Sellah (Saint-Bruno—Saint-Hubert) — Quels ont été les montants dépensés par le gouvernement dans la circonscription de Saint-Bruno—Saint-Hubert depuis l'exercice financier 2004-2005 jusqu'à aujourd'hui (i) par ministère ou organisme, (ii) par programme ou initiative?
Q-4402 — February 6, 2012 — Mr. Stewart (Burnaby—Douglas) — With regard to grants, contributions and contracts by Western Economic Diversification Canada in 2009: (a) what funding applications were approved by the Minister’s office, identified by (i) project name, (ii) applicant name, (iii) number of times previously submitted, (iv) date approved, (v) amount requested, (vi) amount awarded, (vii) sector, (viii) federal electoral district determined by application address; (b) what funding applications were rejected by the Minister’s office, identified by (i) project name, (ii) applicant name, (iii) total amount of submitted applications, (iv) date rejected, (v) amount requested, (vi) sector, (vii) federal electoral district determined by application address; (c) for each federal electoral district, what is the total value of funding requests within each federal electoral district that were (i) approved, (ii) turned down; and (d) what untendered contracts were issued by or on behalf of the Minister? Q-4402 — 6 février 2012 — M. Stewart (Burnaby—Douglas) — En ce qui concerne les subventions, les contributions et les contrats de Diversification de l'économie de l'Ouest Canada, en 2009 : a) quelles demandes de financement ont été approuvées par le bureau de la ministre, selon (i) le nom du projet, (ii) le nom du demandeur, (iii) le nombre de fois où la demande a été présentée, (iv) la date d’approbation, (v) le montant demandé, (vi) le montant accordé, (vii) le secteur, (viii) la circonscription fédérale associée à l’adresse de la demande; b) quelles demandes de financement ont été refusées par le bureau de la ministre, selon (i) le nom du projet, (ii) le nom du demandeur, (iii) le nombre total de demandes présentées, (iv) la date de refus, (v) le montant demandé, (vi) le secteur, (vii) la circonscription fédérale associée à l’adresse de la demande; c) pour chaque circonscription fédérale, quelle est la valeur totale des demandes de financement qui ont été (i) approuvées, (ii) rejetées; d) quels contrats sans appel d’offres ont été émis par la ministre ou en son nom?
Q-4412 — February 6, 2012 — Ms. Liu (Rivière-des-Mille-Îles) — What is the total amount of government funding allocated to the constituency of Rivière-des-Mille-Îles between fiscal year 2007-2008 and the last fiscal year, broken down by (i) department or agency, (ii) initiative or program, (iii) year, (iv) amount, (v) recipient? Q-4412 — 6 février 2012 — Mme Liu (Rivière-des-Mille-Îles) — À combien s’élèvent le total des fonds gouvernementaux alloués à la circonscription de Rivière-des-Mille-Îles depuis l’exercice 2007-2008 jusqu’au dernier exercice financier, par (i) ministère ou agence, (ii) initiative ou programme, (iii) année, (iv) montant, (v) bénéficiaire?
Q-4422 — February 6, 2012 — Ms. Liu (Rivière-des-Mille-Îles) — With regard to hydraulic fracking: (a) which chemicals have been approved for use as hydraulic fracking fluids; (b) which chemicals are being used as hydraulic fracking fluids in Canadian projects; (c) what are the titles of the studies or reports done or in progress, by or on behalf of the government, that cover, in whole or in part, the subject of (i) the environmental impacts of hydraulic fracking, (ii) the long term impacts of hydraulic fracking on aquifers and fresh water supplies, (iii) the health impacts of hydraulic fracking; (d) what sites in Canada are being monitored for contamination or excessive pollution as a result of fracking; (e) what is the total number of cubic meters of water that have been permitted to be used in hydraulic fracking, (i) per day, (ii) by project; (f) how many instances of contaminated water have been linked to fracking since 2000, broken down by (i) year, (ii) project; (g) what impacts do working in hydraulic fracking projects have on the health of citizens living within close proximity to hydraulic fracking projects; (h) what are the cancer rates for citizens living in communities that are in close proximity to hydraulic fracking projects; (i) what events linked to hydraulic fracking have caused (i) property damage, (ii) illness, (iii) death to humans and animals; (j) which companies have been registered in Canada to conduct hydraulic fracking; (k) what is the complete list of federal regulations to which hydraulic fracking operations are subject, and is the government planning new regulation for hydraulic fracking operations; and (l) what consultations has the government undertaken, formally or informally, on the subject of hydraulic fracking? Q-4422 — 6 février 2012 — Mme Liu (Rivière-des-Mille-Îles) — En ce qui concerne la fracturation hydraulique : a) quels produits chimiques ont été homologués comme fluides pouvant être utilisés dans la fracturation hydraulique; b) quels produits chimiques sont utilisés dans la fracturation hydraulique au Canada; c) quels sont les titres des études ou rapports en cours ou complétés, effectués ou commandés, par le gouvernement qui traitent en partie ou en totalité des (i) impacts environnementaux de la fracturation hydraulique, (ii) impacts à long terme de la fracturation hydraulique sur les couches aquifères et les réserves en eau douce, (iii) impacts sur la santé de la fracturation hydraulique; d) quels sites au Canada font l’objet d’un contrôle de contamination ou de pollution excessive attribuable à la fracturation; e) combien de mètres cubes d’eau les promoteurs des projets sont-ils autorisés à utiliser dans la fracturation hydraulique, (i) par jour, (ii) par projet; f) combien d’incidents d’eau contaminée liés à la fracturation a-t-on relevés depuis 2000, ventilés par (i) année, (ii) projet; g) quels impacts ont les projets de fracturation hydraulique sur la santé des citoyens vivant à proximité; h) quels sont les taux de cancer chez les citoyens vivant dans des localités suitées à proximité des projets de fracturation hydraulique; i) quels incidents liés à la fracturation hydraulique ont causé (i) des dommages à la propriété, (ii) des maladies, (iii) des décès chez les humains et les animaux; j) quelles entreprises au Canada sont autorisées à faire de la fracturation hydraulique; k) quelle est la liste complète des règlements fédéraux auxquels les entreprises de fracturation hydraulique sont assujetties et le gouvernement planifie-t-il adopter de nouveaux règlements ciblant les entreprises de fracturation hydraulique; l) quelles consultations le gouvernement a-t-il officiellement ou officieusement entreprises au sujet de la fracturation hydraulique?
Q-4432 — February 6, 2012 — Ms. Quach (Beauharnois—Salaberry) — With regard to the dismantling or transformation of the cargo ship Kathryn Spirit by the company Groupe Saint-Pierre: (a) what federal statutes and regulations apply to the transformation of the ship; (b) which departments are responsible for enforcing the statutes and regulations in this type of situation; (c) has Environment Canada assessed the environmental risks of the operation; (d) has Environment Canada attended any meetings with Groupe St-Pierre and other departments or levels of government; (e) what was the outcome of those meetings; (f) what are Environment Canada’s evaluation criteria for this type of operation; (g) what were the results of the environmental assessment; (h) what measures has Environment Canada or any other federal department taken to ensure that there is no environmental accident before, during or after the operation; (i) what federal standards does this type of operation have to meet; (j) does the company dismantling or transforming the ship have to obtain a certificate of authorization from Environment Canada or any other department before proceeding; (k) what are Canada’s obligations under the Basel Convention in this type of situation; (l) what are the federal government’s and the company’s responsibilities in the event of an environmental accident; (m) has Environment Canada or any other federal department compiled a list or is it aware of other similar operations undertaken elsewhere in Canada; (n) has Environment Canada ever refused to allow an operation of this type to proceed; (o) where is the ship from; and (p) what portion of liability do the federal government and the provincial government bear in this type of situation? Q-4432 — 6 février 2012 — Mme Quach (Beauharnois—Salaberry) — En ce qui concerne le démantèlement ou la transformation du bateau Kathryn Spirit par la compagnie Groupe Saint-Pierre : a) quels lois et règlements fédéraux s’appliquent dans le cas de la transformation du bateau; b) quels sont les ministères responsables de faire appliquer les lois et règlements dans une telle situation; c) Environnement Canada a-t-il procédé à une évaluation des risques environnementaux de l’opération; d) Environnement Canada a-t-il pris part à des réunions avec le Groupe St-Pierre et d’autres ministères ou paliers de gouvernement; e) quels sont les résultats de ces réunions; f) quels sont les critères d’évaluation d’une telle opération par Environnement Canada; g) quels sont les résultats de l’évaluation environnementale; h) quelles sont les mesures prises par Environnement Canada ou tout autre ministère fédéral pour s’assurer qu’il n’y ait pas d’accident environnemental avant, durant ou après l’opération; i) quelles sont les normes fédérales à respecter pour une telle opération; j) la compagnie qui procède au démantèlement ou à la transformation du bateau doit-elle demander un certificat d’autorisation à Environnement Canada ou à tout autre ministère avant de procéder aux opérations; k) quelles sont les obligations du Canada dans le cadre de la Convention de Bâle dans une telle situation; l) quelles sont les responsabilités du gouvernement fédéral et de l’entreprise dans l’éventualité d’un accident environnemental; m) Environnement Canada ou tout autre ministère fédéral a-t-il recensé ou a-t-il eu connaissance d’autres opérations du même genre ailleurs au pays; n) Environnement Canada a-t-il déjà interdit une telle opération; o) quelle est la provenance du bateau; p) quelle est la part de responsabilité du gouvernement fédéral et du gouvernement provincial dans un tel cas?
Q-4442 — February 6, 2012 — Mr. Mai (Brossard—La Prairie) — With regard to the allegations of and investigations into corruption at the Canada Revenue Agency (CRA): (a) how many employees have been fired or constructively dismissed over allegations of corruption, (i) what was their position or role at the CRA, (ii) how many have left under unfavorable circumstances over allegations of corruption, (iii) how did these allegations come to light at the CRA, (iv) were the CRA employees given the specific cause for their dismissal, (v) what are the different reasons for their dismissal; (b) under which authority does the CRA conduct investigations into allegations of corruption and with what investigative tools; (c) how many internal investigations were there at the CRA (i) this year, (ii) in the past two decades; (d) does the CRA employ internal auditors whose responsibilities include investigating allegations of corruption, and, if so, (i) how many such Full-Time Equivalent (FTE) internal auditors does the CRA employ, (ii) what are their job descriptions; (e) does the CRA employ external auditors whose responsibilities include investigating allegations of corruption, and, if so, (i) how many such FTE external auditors does the CRA employ, (ii) what are their job descriptions; (f) what was the budget for those internal and external auditors identified in (d) and (e) in 2009-2010 and 2010-2011; (g) what is the 10-year trend for the budgeting and FTE staffing of internal and external auditors at the CRA; (h) has the CRA’s internal capacity to investigate increased or decreased and, if so, by how much; (i) are there different departments within the CRA handling internal investigations into allegations of corruption; (j) what are the different processes involved in an investigation into allegations of corruption at the CRA, (i) at what time in the investigative process is the RCMP involved, (ii) how many times has the RCMP been involved in investigative processes at the CRA, (iii) how many of these instances have resulted in further investigation; (k) can the RCMP investigate allegations of corruption without CRA consent and, if so, how many times has it happened in the past; (l) what information concerning allegations of corruption is shared by the RCMP and the CRA, (i) can the CRA ask the RCMP for updates on ongoing investigations, (ii) does the RCMP provide progress reports or recommendations to the CRA at the end or during investigations, (iii) how long is the average duration of investigations, (iv) what is the level of communication between the CRA and the RCMP during investigations, (v) is the government planning on improving the process, (vi) have there been recent steps to improve these relations; (m) who at the CRA has the authority to ask (i) for internal investigations, (ii) for external investigations; (n) following investigations into allegations of corruption by the CRA, how many charges have been laid, (i) how many charges have led to convictions, (ii) what are the most common charges, (iii) what departments are more vulnerable to allegations of corruption; (o) what are the different evidence-gathering impediments when investigating these allegations, (i) is the Canada Evidence Act ever used by CRA investigators or auditors, (ii) has the CRA ever asked the Department of Justice to reform the Canada Evidence Act; (p) what is the level of information-sharing between the CRA and different bodies such as, but not limited to, (i) federal or provincial departments, (ii) federal or provincial agencies, (iii) the provincial police and municipal police; (q) how does the CRA plan to eliminate corruption at the CRA; (r) have there been any studies or task forces mandated to look at how best to eliminate corruption at the CRA; (s) what are the mechanisms recently put in place to eliminate or take into account corruption practices; (t) what will be the effect of cuts to expenditures at the CRA on the CRA auditor or internal investigative capacity; (u) of the known cases of corruption, is corporate tax fraud or individual tax fraud more prevalent and, consequently, what departments are most scrutinized by internal investigators; and (v) what are the CRA internal investigation guidelines? Q-4442 — 6 février 2012 — M. Mai (Brossard—La Prairie) — En ce qui concerne les allégations de corruption et les enquêtes y afférentes à l’Agence du revenu du Canada (ARC) : a) combien d’employés ont été congédiés de façon déguisée ou non en rapport avec les allégations de corruption, (i) quel était leur poste ou leur rôle à l’ARC, (ii) combien ont quitté leur emploi dans des circonstances défavorables en rapport avec les allégations de corruption, (iii) comment ces allégations sont-elles venues au jour à l’ARC, (iv) les employés de l’ARC ont-ils été informés des motifs précis de leur congédiement, (v) quels sont les différents motifs fournis pour justifier leur congédiement; b) en vertu de quels pouvoirs l’ARC mène-t-elle les enquêtes sur les allégations de corruption et quels outils d’enquête utilise-t-elle; c) combien y a-t-il eu d’enquêtes internes à l’ARC (i) cette année, (ii) dans les deux dernières décennies; d) l’ARC emploie-t-elle des vérificateurs internes chargés entre autres d’enquêter sur les allégations de corruption et, si oui, (i) combien de vérificateurs internes équivalents temps plein (ETP) l’ARC emploie-t-elle, (ii) quelle est leur description de tâches; e) l’ARC emploie-t-elle des vérificateurs externes chargés entre autres d’enquêter sur les allégations de corruption et, si oui, (i) combien de vérificateurs externes équivalents temps plein (ETP) l’ARC emploie-t-elle, (ii) quelle est leur description de tâches; f) quel était le budget des vérificateurs internes et externes visés en d) et e) en 2009-2010 et 2010-2011; g) comment ont évolué depuis 10 ans le budget et les ETP des vérificateurs internes et externes de l’ARC; h) les capacités d’enquête internes de l’ARC ont-elles augmenté ou diminué et, si oui, de combien; i) les enquêtes internes sur les allégations de corruption relèvent-elles de plusieurs services au sein de l’ARC; j) quels processus comportent une enquête sur des allégations de corruption à l’ARC, (i) à quel stade du processus d’enquête la GRC intervient-elle, (ii) combien de fois la GRC est-elle intervenue dans les processus d’enquête de l’ARC, (iii) dans combien de ces cas y a-t-il eu des enquêtes plus poussées; k) la GRC peut-elle enquêter sur des allégations de corruption sans le consentement de l’ARC et, si oui, (i) combien de fois est-ce arrivé par le passé; l) quels renseignements sur les allégations de corruption la GRC et l’ARC partagent-elles, (i) l’ARC peut-elle demander à la GRC des mises au point sur les enquêtes en cours, (ii) la GRC soumet-elle des rapports d’avancement ou des recommandations à l’ARC à la fin des enquêtes ou durant celles-ci, (iii) combien durent en moyenne les enquêtes, (iv) quel est le niveau de communication entre l’ARC et la GRC durant les enquêtes, (v) le gouvernement compte-t-il améliorer le processus, (vi) a-t-on pris récemment des mesures pour améliorer ces relations; m) qui à l'ARC est autorisé à demander (i) des enquêtes internes, (ii) des enquêtes externes; n) dans le cadre des enquêtes sur les allégations de corruption à l’ARC, combien a-t-on porté d’accusations, (i) combien de ces accusations ont débouché sur une condamnation, (ii) quelles sont les accusations les plus communes, (iii) quels services sont plus vulnérables aux allégations de corruption; o) quelles sont les entraves à la collecte des éléments de preuve pendant les enquêtes sur ces allégations, (i) les enquêteurs ou les vérificateurs de l’ARC invoquent-ils la Loi sur la preuve au Canada, (ii) l’ARC a-t-elle déjà demandé au ministère de la Justice de réformer la Loi sur la preuve au Canada; p) dans quelle mesure y a-t-il partage de renseignements entre l’ARC et des organismes comme, entre autres, (i) les ministères fédéraux ou provinciaux, (ii) les organismes fédéraux ou provinciaux, (iii) les polices provinciales ou municipales; q) comment l’ARC compte-t-elle éliminer la corruption en son sein; r) a-t-on commandé des études ou mis sur pied des groupes de travail sur les meilleures façons d’éliminer la corruption à l’ARC; s) quels mécanismes a-t-on mis en place récemment pour éliminer ou prendre en compte les pratiques de corruption; t) quel effet les compressions budgétaires auront-elles sur les capacités de vérification et d’enquête interne de l’ARC; u) parmi les cas connus de corruption, la fraude vise-t-elle davantage l’impôt sur les sociétés ou l’impôt sur les particuliers et, par conséquent, quels services sont examinés de plus près par les enquêteurs; v) quelles sont les directives internes de l’ARC régissant les enquêtes?
Q-4452 — February 7, 2012 — Mr. Thibeault (Sudbury) — What are the criteria used by the government and the Minister of Industry when determining whether an anti-competitive practice has had, is having, or is likely to have the effect of preventing or lessening competition substantially in a market, pursuant to paragraph 79(1)(c) of the Competition Act? Q-4452 — 7 février 2012 — M. Thibeault (Sudbury) — Quels critères le gouvernement et le ministre de l’Industrie utilisent-ils pour déterminer si une pratique anticoncurrentielle a eu, a encore ou risque d’avoir pour effet d’empêcher ou de réduire de façon substantielle la concurrence sur un marché, conformément à l’alinéa 79(1)c) de la Loi sur la concurrence?
Q-4462 — February 7, 2012 — Mr. Thibeault (Sudbury) — What is the total amount of funding allocated by the government for the fiscal year 2010-2011 within the constituency of Sudbury, specifying each department, agency, initiative, and amount? Q-4462 — 7 février 2012 — M. Thibeault (Sudbury) — Quel est le financement total affecté par le gouvernement pour l’exercice 2010-2011 à la circonscription de Sudbury, en précisant chaque ministère ou organisme, l’initiative et le montant?
Q-4472 — February 7, 2012 — Mr. Thibeault (Sudbury) — With respect to sport funding: (a) what is the total amount of government funding for each fiscal year since 2008-2009, up to and including the current fiscal year, allocated to amateur sports, specifying each department or agency, initiative and amount; and (b) what is the total amount of government funding allocated to sport injury prevention and awareness for each fiscal year since 2008-2009, up to and including the current fiscal year, allocated to amateur sports, specifying each department or agency, initiative and amount? Q-4472 — 7 février 2012 — M. Thibeault (Sudbury) — En ce qui concerne le financement accordé aux sports : a) quel est le montant total du financement que le gouvernement a accordé aux sports amateurs pour chaque exercice financier depuis 2008-2009, incluant l’exercice en cours, en précisant dans chaque cas le ministère ou l’organisme, l’initiative et le montant; b) quel est le montant total du financement que le gouvernement a accordé à la prévention des blessures sportives et à la sensibilisation pour chaque exercice financier depuis 2008-2009, incluant l’exercice en cours, pour les sports amateurs, en précisant dans chaque cas le ministère ou l’organisme, l’initiative et le montant?
Q-4482 — February 7, 2012 — Mr. Bélanger (Ottawa—Vanier) — How many childcare spaces were created in fiscal years 2006-2007, 2007-2008, 2008-2009 and 2010-2011, in each province and territory with the financial assistance of the government? Q-4482 — 7 février 2012 — M. Bélanger (Ottawa—Vanier) — Combien de places en garderie ont été créées au cours des exercices 2006-2007, 2007-2008, 2008-2009 et 2010-2011, dans chaque province et territoire avec l’aide financière du gouvernement?
Q-4492 — February 7, 2012 — Mr. Bélanger (Ottawa—Vanier) — How many childcare spaces were created for official-language minority communities in fiscal years 2006-2007, 2007-2008, 2008-2009 and 2010-2011, in each province and territory with the financial assistance of the government? Q-4492 — 7 février 2012 — M. Bélanger (Ottawa—Vanier) — Combien de places en garderie ont été créées pour les communautés de langue officielle en situation minoritaire au cours des exercices 2006-2007, 2007-2008, 2008-2009 et 2010-2011, dans chaque province et territoire avec l'aide financière du gouvernement?
Q-4502 — February 8, 2012 — Ms. Foote (Random—Burin—St. George's) — With regard to Marine Atlantic’s executive hiring practices: (a) where has the position of Chief Information Officer historically been located; (b) where has the position of Operations for the ports of Channel-Port aux Basques, North Sydney and Argentia historically been located; (c) what is the rationale for the historical position locations; (d) why was the position of Chief Information Officer moved to St. John’s; (e) are there plans to move additional positions out of Channel-Port aux Basques; (f) what steps were taken to recruit a candidate who lived in or who would relocate to Channel-Port aux Basques when filling the Chief Information Officer position; (g) what were the job criteria required for the Chief Information Officer; (h) did the job posting specify that a successful applicant had to reside in or work in Channel-Port aux Basques; (i) how many applicants were there for the position of Chief Information Officer; and (j) how many applicants were there from Channel-Port aux Basques? Q-4502 — 8 février 2012 — Mme Foote (Random—Burin—St. George's) — En ce qui concerne les pratiques d’embauche de cadres supérieurs de Marine Atlantique : a) où a été situé historiquement le poste de dirigeant principal de l’information; b) où a été situé historiquement le poste d’Opérations pour les ports de Channel-Port aux Basques, de North Sydney et d’Argentia; c) quelle est la raison pour le placement historique de ces postes; d) pourquoi le poste de dirigeant principal de l’information a-t-il été déplacé à St. John’s; e) y a-t-il des plans pour déplacer d’autres postes de Channel-Port aux Basques; f) quelles mesures ont été prises pour recruter un candidat qui habitait ou aurait été déplacé à Channel-Port aux Basques au moment de la dotation du poste de dirigeant principal de l’information; g) quels étaient les critères d’emploi requis pour le dirigeant principal de l’information; h) l’offre d’emploi précisait-elle que le candidat choisi devait habiter ou travailler à Channel-Port aux Basques; i) combien de candidats y avait-il pour le poste de dirigeant principal de l’information; j) combien de candidats provenaient de Channel-Port aux Basques?
Q-4512 — February 8, 2012 — Mr. Casey (Charlottetown) — With regard to government advertising: (a) which departments or agencies were engaged in any television advertisement by a department or agency of the government during the television broadcast of any Super Bowl game from Super Bowl XL (2006) through Super Bowl XLVI (2012) inclusively; (b) what were the stated objectives and purpose of each advertisement; (c) when did each advertisement run; (d) what was the cost of each advertisement; (e) which private companies were involved in the conception, design, and production of the ads; (f) were any advertising contracts sole-sourced and, if so, which ones and why; (g) what was the target audience of each campaign; (h) in which television markets did they appear; (i) what analysis was or will be done on the effectiveness of any such advertisement; (j) who undertook or will undertake that analysis, and at what cost; and (k) which of these advertisements failed to meet the stated objectives of the campaign, and why? Q-4512 — 8 février 2012 — M. Casey (Charlottetown) — En ce qui concerne la publicité du gouvernement : a) quels ministères ou organismes ont participé à une annonce télédiffusée par un ministère ou un organisme du gouvernement au cours de la télédiffusion d’un match du Super Bowl, du Super Bowl XL (2006) au Super Bowl XLVI (2012) inclusivement; b) quels étaient les objectifs convenus et le but de chaque annonce publicitaire; c) quand chaque annonce a-t-elle été diffusée; d) quel a été le coût de chaque annonce; e) quelles entreprises privées ont participé à la création, à la conception et à la production des annonces; f) des contrats de publicité ont-ils été attribués à un fournisseur exclusif et, si tel est le cas, lesquels et pourquoi; g) qui était le public cible de chaque campagne; h) dans quels marchés ont-elles été télédiffusées; i) quelle analyse a été ou sera faite sur l’efficacité de toute annonce publicitaire du genre; j) qui a mené ou mènera cette analyse et combien a-t-elle coûté ou coûtera-t-elle; k) parmi ces annonces, lesquelles n’ont pas atteint les objectifs convenus de la campagne et pourquoi?
Q-4522 — February 9, 2012 — Mr. Benskin (Jeanne-Le Ber) — With regard to social and cooperative housing facilities: (a) what steps is the government presently taking, or does it anticipate taking in the next 12 months, to renew or extend the long-term operating agreements upon which social and cooperative housing organizations across Canada depend, given the impending expiry of funding arrangements established under Section 56.1 of the former National Housing Act, Section 95.1 of the Canada Mortgage and Housing Corporation (CMHC) Act, and agreements entered into by the federal government and Quebec government pertaining to Article 61 of Quebec’s National Housing Law; (b) will the government immediately commit to the renewal of the Renovation and Retrofit of Social Housing component of Canada’s Economic Action Plan; (c) what is the government’s long-term strategy to ensure the immediate health and survival of social and cooperative housing organizations subject to long-term operating partnerships with the federal government in the event these agreements expire; (d) what impact assessment has the government undertaken to verify the broader impact of expiring long-term operating agreements on the economy, job creation, and the affordability of residential housing for low income Canadians; (e) what steps has the government taken, or will take in the next 12 months, to develop and implement a coordinated strategy with provincial and municipal authorities for the funding of social and cooperative housing; and (f) what is the government’s plan to ensure the future construction and maintenance of social and cooperative housing across Canada? Q-4522 — 9 février 2012 — M. Benskin (Jeanne-Le Ber) — En ce qui concerne les installations de logement social et coopératif : a) quelles mesures le gouvernement prend-il, ou prévoit-il prendre au cours des 12 prochains mois pour renouveler ou prolonger les ententes d’exploitation à long terme desquelles les organismes de logement social et coopératif de tout le Canada dépendent, compte tenu de l’expiration des ententes de financement établies en vertu de l’article 56.1 de l’ancienne Loi nationale sur l'habitation et de l’article 95.1 de la Loi sur la Société canadienne d'hypothèques et de logement, ainsi que des ententes conclues entre le gouvernement fédéral et le gouvernement du Québec au sujet de l’article 61 de la Loi nationale sur l’habitation du Québec; b) le gouvernement s’engagera-t-il immédiatement à renouveler la partie sur la rénovation et l’amélioration des logements sociaux du Plan d’action économique du Canada; c) quelle est la stratégie à long terme du gouvernement pour assurer la santé et la survie immédiate des organismes de logement social et coopératif assujettis à des partenariats d’exploitation à long terme avec le gouvernement fédéral si ces ententes expirent; d) quelle étude le gouvernement a-t-il entreprise afin d’évaluer l’effet global qu’aurait l’expiration des ententes d’exploitation à long terme sur l’économie, sur la création d’emplois et sur l’abordabilité du logement résidentiel pour les Canadiens à faible revenu; e) quelles mesures le gouvernement prend-il, ou prévoit-il prendre au cours des 12 prochains mois, pour élaborer et mettre en œuvre, avec les responsables provinciaux et municipaux, une stratégie coordonnée pour le financement du logement social et coopératif; f) quel est le plan du gouvernement pour assurer la construction et l’entretien des installations de logement social et coopératif à l’échelle du Canada, dans l’avenir?
Q-453 — February 9, 2012 — Mr. Thibeault (Sudbury) — For each fiscal year from 2006-2007 to 2010-2011, what is the total amount of: (a) payments made to the government by credit card; and (b) merchant fees paid by the government to credit card providers? Q-453 — 9 février 2012 — M. Thibeault (Sudbury) — Pour chaque exercice de 2006-2007 à 2010-2011, à combien s’élèvent, au total : a) les paiements faits au gouvernement par carte de crédit; b) les frais de transaction payés par le gouvernement aux fournisseurs de cartes de crédit?
Q-4542 — February 10, 2012 — Mr. Côté (Beauport—Limoilou) — What is the total funding allocated by the government to the constituency of Lotbinière—Chutes-de-la-Chaudière between fiscal year 2006–2007 and the current fiscal year, broken down by (i) department or agency, (ii) activity, (iii) amount? Q-4542 — 10 février 2012 — M. Côté (Beauport—Limoilou) — Quel est le montant total du financement accordé par le gouvernement depuis l'exercice 2006–2007 jusqu'à l'exercice en cours dans la circonscription de Lotbinière—Chutes-de-la-Chaudière, en précisant chaque (i) ministère ou organisme, (ii) initiative, (iii) montant?
Q-4552 — February 10, 2012 — Mr. Valeriote (Guelph) — With respect to the “Projects Map” (located at the following link: http://www.actionplan.gc.ca/eng/map.asp) on the “Canada’s Economic Action Plan” website: (a) what is the total number of place marks, icons or symbols that have been uploaded to the project map since the project map was created; (b) what is the total number of place marks, icons or symbols that remain on the project map since the project map was created; (c) what is the total number of place marks, icons or symbols that have been removed from the project map since the project map was created; (d) for the answers to each of (a), (b) and (c), what is (i) the date it was uploaded to the project map, (ii) the date it was modified on the project map, (iii) the date it was removed from the project map, (iv) the geographic coordinates (latitude and longitude), (v) the location, specifying the address, city, riding, and province, (vi) the Project ID or the name of the project or program, (vii) the name of the related initiative, (viii) the description of the project, (ix) the address of the website containing additional information about the project, (x) the date of the funding announcement, (xi) the total project cost at the time of the announcement, (xii) the value of the federal contribution to the project at the time of the announcement, (xiii) the company or companies who were contracted in association with the program or project, specifying the amount of funding each was to receive for its services and the final amount they received for their service, (xiv) the final amount of the project cost, (xv) the final amount of the federal contribution that was delivered; (e) for all projects or programs listed in (d)(vi), did the projects or program meet the government’s completion deadline and, if not, why; and (f) for all projects or programs listed in (d)(vi), (i) was the government’s approval of any project or program subsequently withdrawn and, if so, why and on what date, (ii) were any of the projects or programs that the government had approved for funding subsequently cancelled and, if so, why and on what date? Q-4552 — 10 février 2012 — M. Valeriote (Guelph) — En ce qui concerne la « carte des projets » (http://www.actionplan.gc.ca/fra/map.asp) sur le site Web du « Plan d’action économique du Canada » : a) combien de repères, icônes ou symboles a-t-on téléchargés au total sur la carte des projets depuis sa création; b) combien de repères, icônes ou symboles reste-t-il au total sur la carte des projets depuis sa création; c) combien de repères, icônes ou symboles a-t-on supprimés au total de la carte des projets depuis sa création; d) pour la réponse à chaque élément de a), b) et c), (i) à quelle date l’a-t-on téléchargé sur la carte des projets, (ii) à quelle date l’a-t-on modifié sur la carte des projets, (iii) à quelle date l’a-t-on supprimé de la carte des projets, (iv) quelles en sont les coordonnées géographiques (latitude et longitude), (v) quel en est l’emplacement, soit l'adresse, la ville, la circonscription et la province, (vi) quel est le numéro d’identification du projet ou le nom du projet ou du programme, (vii) quel est le nom de l’initiative s’y rapportant, (viii) quelle est la description du projet, (ix) quelle est l’adresse du site Web donnant les détails du projet, (x) quelle est la date d’annonce du financement, (xi) quel était le coût total du projet au moment de l’annonce, (xii) quelle était la valeur de la contribution fédérale au projet au moment de l’annonce, (xiii) quelle est ou quelles sont les entreprises ayant bénéficié d’un contrat relativement à ce programme ou projet, avec le montant des fonds que chacune devait recevoir pour ses services et le montant final que chacune a reçu pour ses services, (xiv) quel est le montant final du coût du projet, (xv) quel est le montant final de la contribution fédérale versée; e) pour tous les projets ou programmes énumérés en d)(vi), les projets ou programmes ont-ils respecté l’échéance d’achèvement du gouvernement et, sinon, pourquoi; f) pour tous les projets ou programmes énumérés en d)(vi), (i) y a-t-il des projets ou des programmes à qui l’on a par la suite retiré l’approbation du gouvernement et, si oui, pour quelle raison et à quelle date, (ii) y a-t-il des projets ou des programmes dont le financement avait été approuvé par le gouvernement qui ont par la suite été annulés et, si oui, pour quelle raison et à quelle date?
Q-4562 — February 10, 2012 — Mr. Valeriote (Guelph) — With regard to television advertising (commercials) which promotes Canada’s Economic Action Plan: (a) how many television advertisements have been (i) created in total, broken down by year, (ii) given an identification number or name or a Media Authorization Number (ADV number); (b) what is the identification number or name or ADV number for each advertisement listed in (a)(ii); and (c) for the answers to each part of (a), (i) what is the length (minutes and seconds) of each advertisement, (ii) what is the cost for the production or creation of each advertisement, (iii) what companies were used to produce or create each advertisement, (iv) what is the number of times each advertisement has aired, specifying total number of times and total length of time (minutes and seconds), broken down by year and by month for each advertisement, (v) what was the total cost to air or publish each advertisement, broken down by year and by month, (vi) what criteria were used to select each of the advertisement placements, (vii) what media outlets were used to air or publish each advertisement, broken down by year and by month, (viii) what was the total amount spent per outlet, broken down by year and by month? Q-4562 — 10 février 2012 — M. Valeriote (Guelph) — En ce qui concerne la publicité télévisuelle faisant la promotion du Plan d’action économique du Canada : a) combien d’annonces télévisuelles (i) a-t-on créées au total, avec ventilation par année, (ii) ont-elles reçu un nom ou numéro d’identification ou un numéro d’autorisation média (numéro PUB); b) quel est le nom ou numéro d’identification ou le numéro PUB de chaque annonce énumérée en a)(ii); c) pour les réponses à chaque élément de a), (i) quelle est la durée (minutes et secondes) de chaque annonce, (ii) quel est le coût de production ou de création de chaque annonce, (iii) quelles sont les entreprises employées pour produire ou créer chaque annonce, (iv) combien de fois chaque annonce a-t-elle été diffusée, avec nombre total de fois et durée totale (minutes et secondes), avec ventilation par année et par mois pour chaque annonce, (v) quel est le coût total de diffusion ou de publication de chaque annonce, avec ventilation par année et par mois, (vi) quels sont les critères employés pour sélectionner chaque placement publicitaire, (vii) quels sont les médias employés pour la diffusion ou la publication de chaque annonce, avec ventilation par année et par mois, (viii) quel est le montant total dépensé par média, avec ventilation par année et par mois?
Q-4572 — February 10, 2012 — Mr. Valeriote (Guelph) — With regard to farms and farming in Canada: (a) what is the government’s definition of (i) individual farms, (ii) family farms, (iii) family farm corporations, (iv) non-family farm corporations; (b) for the answer to each part of (a), for each of the fiscal years from 2000-2001 to 2011-2012, across Canada as a whole and broken down by province and territory, what is the total number of (i) individual farms, (ii) family farms, (iii) family farm corporations, (iv) non-family farm corporations; (c) for the answer to each part of (b), and for each of the fiscal years from 2000-2001 to 2011-2012, across Canada as a whole and broken down by province and territory, what is the total number of farms by farm type based on the North American Industrial Classification System (NAICS) farm-typing categories; (d) for the answer to each part of (b), and for each of the fiscal years from 2000-2001 to 2011-2012, across Canada as a whole and broken down by province and territory, what is the total number of individual farms, family farms, family farm corporations, non-family farm corporations owned entirely by (i) a Canadian citizen, (ii) a Canadian corporation or company with a head office in Canada, specifying the name of the corporation or company, location, address, city, and province of the head office; (e) for the answer to each part of (b), and for each of the fiscal years from 2000-2001 to 2011-2012, across Canada as a whole and broken down by province and territory, what is the total number of individual farms, family farms, family farm corporations, non-family farm corporations owned entirely by (i) a non-Canadian citizen, (ii) a foreign corporation or company, specifying the name of the corporation or company, the country in which the head office is located and if they have a branch office in Canada, specifying the location, address, city, and province of the head office; (f) for the answer to each part of (b), and for each of the fiscal years from 2000-2001 to 2011-2012, across Canada as a whole and broken down by province and territory, what is the total number of individual farms, family farms, family farm corporations, non-family farm corporations owned in part by (i) a non-Canadian citizen, (ii) a foreign corporation or company, specifying the name of the corporation or company, the country in which the head office is located and, if they have a branch office in Canada, specifying the location, address, city, and province of the head office; (g) for the answer to each part of (b), (d), (e), and (f), for each of the fiscal years from 2000-2001 to 2011-2012, across Canada as a whole and broken down by province and territory, what is (i) the total area owned in hectares, (ii) the total farmed area in hectares, (iii) the total area in hectares rented or leased from others, (iv) the smallest and largest farm in hectares owned, farmed, rented or leased from others, (v) the type of farming conducted based on NAICS farm-typing categories; (h) for the answer to each part of (b)(ii)(iii)(iv), (d)(ii)(iii)(iv), (e)(ii)(iii)(iv), and (f)(ii)(iii)(iv), for each of the fiscal years from 2000-2001 to 2011-2012, across Canada as a whole and broken down by province and territory, what is (i) the average reported annual revenues, profits, and losses, (ii) the total amount of federal taxes collected, broken down by the different types of federal tax applicable, (iii) the total amount of Scientific Research and Experimental Development Tax Credit (SR&ED) claimed and the total amount refunded; (i) for the answer to each part of (b)(ii)(iii)(iv), (d)(ii)(iii)(iv), (e)(ii)(iii)(iv), and (f)(ii)(iii)(iv), for each of the fiscal years from 2000-2001 to 2011-2012, across Canada as a whole and broken down by province and territory, what is (i) the total number sold or ownership that was transferred to a Canadian citizen, (ii) the total number sold or ownership that was transferred to a Canadian corporation or company with a head office in Canada specifying the name of the corporation, location, address, city, and province of the head office; (j) for the answer to each part of (b)(ii)(iii)(iv), (d)(ii)(iii)(iv), (e)(ii)(iii)(iv), and (f)(ii)(iii)(iv), for each of the fiscal years from 2000-2001 to 2011-2012, across Canada as a whole and broken down by province and territory, what is (i) the total number sold or ownership that was transferred to a non-Canadian citizen, (ii) the total number sold or ownership that was transferred to a foreign corporation or company, specifying the name of the corporation or company, the country in which the head office is located and if they have a branch office in Canada, specifying the location, address, city, and province of the head office; (k) for the answer to each part of (h) and (i), for each of the fiscal years from 2000-2001 to 2011-2012, across Canada as a whole and broken down by province and territory, what is (i) the total area in hectares sold or ownership that was transferred, (ii) the total farmed area in hectares sold or ownership that was transferred, (iii) the largest farm in hectares owned and/or farmed which was sold or ownership that was transferred, (iv) the total number of farms sold or ownership that was transferred by farm type based on the NAICS farm-typing categories; and (l) for the answer to each part of (d), (e), (f)(ii), what is the total area and farmed area owned by each corporation for each of the fiscal years from 2000-2001 to 2011-2012 across Canada? Q-4572 — 10 février 2012 — M. Valeriote (Guelph) — En ce qui concerne les exploitations agricoles et l’agriculture au Canada : a) quelle définition le gouvernement donne-t-il aux termes (i) exploitation agricole individuelle, (ii) exploitation agricole familiale, (iii) société agricole familiale, (iv) société agricole non familiale; b) pour la réponse à chacun des éléments du point a) et pour chaque exercice de 2000-2001 à 2011-2012, dans l’ensemble du Canada et réparti par province et territoire, quel est le nombre total (i) d’exploitations agricoles individuelles, (ii) d’exploitations agricoles familiales, (iii) de sociétés agricoles familiales, (iv) de sociétés agricoles non-familiales; c) pour la réponse à chacun des éléments du point b) et pour chaque exercice de 2000-2001 à 2011-2012, dans l’ensemble du Canada et réparti par province et territoire, quel est le nombre total d’exploitations agricoles par type d’exploitation agricole selon la classification des exploitations agricoles du Système de classification des industries de l’Amérique du Nord (SCIAN); d) pour la réponse à chacun des éléments du point b) et pour chaque exercice de 2000-2001 à 2011-2012, dans l’ensemble du Canada et réparti par province et territoire, quel est le nombre total d’exploitations agricoles individuelles, d’exploitations agricoles familiales, de sociétés agricoles familiales, de sociétés agricoles non familiales appartenant entièrement (i) à un citoyen canadien, (ii) à une société ou entreprise canadienne dont le siège est situé au Canada, indiquant le nom de la société ou de l'entreprise ainsi que l’emplacement, l’adresse, la ville et la province du siège; e) pour la réponse à chacun des éléments du point b) et pour chaque exercice de 2000-2001 à 2011-2012, dans l’ensemble du Canada et réparti par province et territoire, quel est le nombre total d’exploitations agricoles individuelles, d’exploitations agricoles familiales, de sociétés agricoles familiales, de sociétés agricoles non familiales appartenant entièrement (i) à un citoyen étranger, (ii) à une société ou entreprise étrangère, indiquant le nom de la société ou de l'entreprise, le pays où est situé son siège et, si elle a un bureau régional au Canada, l’emplacement, l’adresse, la ville et la province du siège; f) pour la réponse à chacun des éléments du point b) et pour chaque exercice de 2000-2001 à 2011-2012, dans l’ensemble du Canada et réparti par province et territoire, quel est le nombre total d’exploitations agricoles individuelles, d’exploitations agricoles familiales, de sociétés agricoles familiales, de sociétés agricoles non familiales appartenant en partie (i) à un citoyen étranger, (ii) à une société ou de l'entreprise étrangère, indiquant le nom de la société ou entreprise, le pays où est situé son siège et, si elle a un bureau régional au Canada, l’emplacement, l’adresse, la ville et la province du siège; g) pour la réponse à chacun des éléments des points b), d), e), et f) et pour chaque exercice de 2000-2001 à 2011-2012, dans l’ensemble du Canada et réparti par province et territoire, (i) quelle est la surface totale détenue en hectares, (ii) quelle est la surface totale exploitée en hectares, (iii) quelle est la surface totale en hectares prise en location ou à bail, (iv) quelles sont, en hectares, la plus petite et la plus grande exploitation agricole détenues, exploitées, prises en location ou à bail, (v) quel est le type d’agriculture pratiqué selon la classification des exploitations agricoles du SCIAN; h) pour la réponse à chacun des éléments des points b)(ii)(iii)(iv), d)(ii)(iii)(iv), e)(ii)(iii)(iv) et f)(ii)(iii)(iv) et pour chaque exercice de 2000-2001 à 2011-2012, dans l’ensemble du Canada et réparti par province et territoire, (i) quels sont les revenus, les profits et les pertes annuels moyens déclarés, (ii) quel est le montant total des impôts fédéraux perçus, réparti par type d’impôt fédéral applicable, (iii) quel est le montant total du crédit d’impôt pour la recherche scientifique et le développement expérimental (RS-DE) demandé et le montant total remboursé; i) pour la réponse à chacun des éléments des points b)(ii)(iii)(iv), d)(ii)(iii)(iv), e)(ii)(iii)(iv) et f)(ii)(iii)(iv) et pour chaque exercice de 2000-2001 à 2011-2012, dans l’ensemble du Canada et réparti par province et territoire, quel est (i) le nombre total de droits de propriété cédés à un citoyen canadien, (ii) le nombre total de droits de propriété cédés à une société ou entreprise canadienne dont le siège est situé au Canada, indiquant le nom de la société ou entreprise ainsi que l’emplacement, l’adresse, la ville et la province du siège; j) pour la réponse à chacun des éléments des points b)(ii)(iii)(iv), d)(ii)(iii)(iv), e)(ii)(iii)(iv) et f)(ii)(iii)(iv) et pour chaque exercice de 2000-2001 à 2011-2012, dans l’ensemble du Canada et réparti par province et territoire, quel est (i) le nombre total de droits de propriété cédés à un citoyen étranger, (ii) le nombre total de droits de propriété cédés à une société ou entreprise étrangère, indiquant le nom de la société ou entreprise, le pays où est situé son siège et, si elle a un bureau régional au Canada, l’emplacement, l’adresse, la ville et la province du siège; k) pour la réponse à chacun des éléments des points h) et i) et pour chaque exercice de 2000-2001 à 2011-2012, dans l’ensemble du Canada et réparti par province et territoire, (i) quelle est la surface totale en hectares pour laquelle les droits de propriété ont été cédés, (ii) quelle est, en hectares, la surface totale exploitée pour laquelle les droits de propriété ont été cédés, (iii) quelle est, en hectares, l’exploitation agricole la plus grande détenue ou exploitée dont les droits de propriété ont été cédés, (iv) quel est le nombre total d’exploitations agricoles dont les droits ont été cédés, réparti par type d’exploitation agricole selon la classification des exploitations agricoles du SCIAN; l) pour la réponse à chacun des éléments des points d), e) et f)(ii), quelles sont la surface totale et la surface exploitée détenue par chaque société pour chaque exercice de 2000-2001 à 2011-2012 dans l’ensemble du Canada?
Q-4582 — February 13, 2012 — Ms. Foote (Random—Burin—St. George's) — With regard to the sea cucumber fishery on the St. Pierre Bank, Northwest Atlantic Fisheries Organization subdivision 3PS: (a) when will the decision be made to issue additional permits to fishers deemed eligible in the Department of Fisheries and Oceans' (DFO) draw of October 13, 2011; (b) when will additional permits be issued to fishers deemed eligible in the DFO's draw of October 13, 2011; and (c) how long will permit recipients be given to ensure that their vessels meet the standards of the DFO before inspections will be carried out? Q-4582 — 13 février 2012 — Mme Foote (Random—Burin—St. George's) — En ce qui concerne la pêche au concombre de mer dans le banc de Saint-Pierre, sous-division 3PS de l’Organisation des pêches de l’Atlantique Nord-Ouest : a) quand prendra-t-on la décision de délivrer d’autres permis aux pêcheurs jugés admissibles au tirage au sort effectué le 13 octobre 2011 par le ministère des Pêches et des Océans; b) quand délivrera-t-on d’autres permis aux pêcheurs jugés admissibles à ce même tirage; c) combien de temps auront les titulaires de permis pour mettre leurs bateaux aux normes du ministère avant la réalisation des inspections?
Q-4592 — February 15, 2012 — Mr. Cotler (Mount Royal) — With respect to Bill C-10, An Act to enact the Justice for Victims of Terrorism Act and to amend the State Immunity Act, the Criminal Code, the Controlled Drugs and Substances Act, the Corrections and Conditional Release Act, the Youth Criminal Justice Act, the Immigration and Refugee Protection Act and other Acts: (a) what steps did the Minister of Justice undertake to conduct a review pursuant to sbs. 4.1(1) of the Department of Justice Act to ensure Bill C-10’s constitutionality and compliance with the Charter of Rights and Freedoms; (b) will the Minister table the review mentioned in subquestion (a) before the House; (c) did the Minister review Bill C-10 in light of section 7 of the Charter regarding cruel and unusual punishments; (d) did the Minister conclude that Bill C-10 respects section 7 of the Charter; (e) has the government undertaken cost projections with respect to litigating challenges to C-10’s constitutionality and, if so, how much has been allocated; and (f) does the government plan to amend Bill C-10 in light of the R. v. Smickle decision? Q-4592 — 15 février 2012 — M. Cotler (Mont-Royal) — En ce qui concerne le projet de loi C-10, Loi édictant la Loi sur la justice pour les victimes d'actes de terrorisme et modifiant la Loi sur l'immunité des États, le Code criminel, la Loi réglementant certaines drogues et autres substances, la Loi sur le système correctionnel et la mise en liberté sous condition, la Loi sur le système de justice pénale pour les adolescents, la Loi sur l'immigration et la protection des réfugiés et d'autres lois : a) quelles mesures le ministre de la Justice a-t-il prises afin de mener un examen en vertu du paragraphe 4.1(1) de la Loi sur le ministère de la Justice en vue de s’assurer de la constitutionnalité du projet de loi C-10 et de sa conformité à la Charte canadienne des droits et libertés; b) le ministre présentera-t-il l’examen mentionné à la sous-question a) à la Chambre; c) le ministre a-t-il examiné le projet de loi C-10 en tenant compte des dispositions relatives aux traitements cruels et inusités de l’article 7 de la Charte; d) le ministre a-t-il conclu que le projet de loi C-10 respecte l’article 7 de la Charte; e) le gouvernement a-t-il établi des prévisions de coûts en ce qui concerne les contestations judiciaires au sujet de la constitutionnalité du projet de loi C-10, et, si tel est le cas, quel est le montant déterminé; f) le gouvernement prévoit-il modifier le projet de loi C-10 de manière à tenir compte de la décision R. c. Smickle?
Q-4602 — February 15, 2012 — Mr. Cotler (Mount Royal) — With regard to the government’s policy on seeking clemency for Canadians sentenced to death abroad: (a) under what circumstances will the government seek clemency; (b) when was the current policy adopted; (c) who proposed the current policy; and (d) how was it adopted? Q-4602 — 15 février 2012 — M. Cotler (Mont-Royal) — En ce qui concerne la politique du gouvernement sur les demandes de clémence pour les Canadiens condamnés à mort à l’étranger : a) dans quelles situations le gouvernement demandera-t-il la clémence; b) quand la politique actuelle a-t-elle été adoptée; c) qui a proposé la politique actuelle; d) comment a-t-elle été adoptée?
Q-4612 — February 15, 2012 — Mr. Cotler (Mount Royal) — With respect to prosecutions for hate speech under sections 318 and 319 of the Criminal Code: (a) from January 1, 2002, to February 15, 2012, how many such requests for prosecution has the Attorney General received; (b) how many of these requests were acted upon; (c) how many prosecutions were commenced, and in which years; and (d) what are the Attorney General’s criteria for assessing cases under these sections? Q-4612 — 15 février 2012 — M. Cotler (Mont-Royal) — En ce qui concerne les poursuites judiciaires pour propos haineux, en vertu des articles 318 et 319 du Code criminel : a) du 1er janvier 2002 au 15 février 2012, combien de demandes de ce type le procureur général a-t-il reçues; b) à combien de ces demandes a-t-on donné suite; c) combien de poursuites ont été entreprises et en quelle année l’ont-elles été; d) quels critères le procureur général utilise-t-il pour l’évaluation des cas en vertu de ces articles?
Q-4622 — February 15, 2012 — Mr. Cotler (Mount Royal) — With respect to the government’s filing in L. and M. v. Attorney General (Canada) and Attorney General (Quebec) regarding same-sex couples married in Canada but comprised of one or more non-residence spouses: (a) by what process was the filing reviewed, by which government employees, and on what dates; (b) did the Minister of Justice or his office, or any other agent or officer of the government, issue any directive with specific regard to this case, and, if so, what were the contents of the directives or memo; (c) has the government amended its filing; (d) if the government has amended its filing, in what way has it done so, and, if not, why not; (e) will the government withdraw its filing; (f) who was the highest-ranking official to have approved the filing and when did this occur; and (g) is it the government’s policy to make similar filings in cases of this nature? Q-4622 — 15 février 2012 — M. Cotler (Mont-Royal) — En ce qui concerne le dépôt du gouvernement dans l’affaire L. et M. c. le procureur général (Canada) et le procureur général (Québec) au sujet des couples de même sexe qui se sont mariés au Canada mais dont au moins l’un des conjoints n’est pas résident : a) par quel processus, par quels employés du gouvernement et à quelles dates le dépôt a-t-il été examiné; b) le ministre de la Justice, son bureau, ou tout autre agent ou représentant du gouvernement a-t-il émis une directive particulière à cette affaire et, si tel est le cas, quelle était la teneur de la directive ou de la note; c) le gouvernement a-t-il modifié son dépôt; d) si le gouvernement a modifié son dépôt, de quelle façon l’a-t-il fait et, dans le cas contraire, pourquoi; e) le gouvernement va-t-il retirer son dépôt; f) qui a été le fonctionnaire le plus élevé en grade à avoir approuvé le dépôt et quand l’a-t-il fait; g) est-ce la politique du gouvernement de présenter des dépôts semblables dans les affaires de cette nature?
Q-4632 — February 15, 2012 — Ms. Freeman (Argenteuil—Papineau—Mirabel) — What is the total amount of government funding allocated to the constituency of Argenteuil—Papineau—Mirabel between fiscal year 2007-2008 and the last fiscal year, broken down by: (a) department or agency; (b) initiative or program; (c) year; (d) amount; and (e) recipient? Q-4632 — 15 février 2012 — Mme Freeman (Argenteuil—Papineau—Mirabel) — Quel est le montant total du financement gouvernemental affecté à la circonscription d’Argenteuil—Papineau—Mirabel de l’exercice 2007-2008 au dernier exercice, réparti par a) ministère ou organisme; b) initiative ou programme; c) année; d) montant; e) destinataire?
Q-4642 — February 15, 2012 — Ms. Freeman (Argenteuil—Papineau—Mirabel) — With regard to Confidential Services for Victims of Abuse (CSVA) program: (a) what steps are being taken to ensure stronger federal-provincial coordination in the delivery of CSVA; (b) once a victim enters the CSVA, what steps are being taken to make sure that access to a secure identity is provided as quickly as possible; (c) how does the CSVA ensure that victims receive adequate support and services during the period in which their new identities are being processed; (d) how does the CSVA adequately provide access to secure housing and financial support for victims entering the program; (e) how does the government intend to redress the fact that victims in the CSVA program in the past were not provided with adequate housing and financial security; (f) what steps are being taken to ensure that the victims entering into the CSVA program now will not face similar difficulties with accessing housing and financial security; (g) what services are provided to victims in the CSVA program after the secure identity is obtained; (h) how are these services coordinated among the provinces and between each province and the federal government; (i) in the event that the secure identity is compromised or revealed, what recourse within the program is available to victims; (j) how can victims whose secure identity is compromised access further services and support; (k) if a victim has complaints about CSVA services received, what recourse is available to them; (l) if a victim has complaints about the timeliness of services provided, what recourse is available to them; (m) what is the timeline for distribution of services in the CSVA program; (n) how is the timeline for distribution of services from the CVSA coordinated with the provinces; and (o) what is the government’s policy concerning the relationship between the CSVA and its international obligation to protect women and girls from violence? Q-4642 — 15 février 2012 — Mme Freeman (Argenteuil—Papineau—Mirabel) — En ce qui concerne le programme Service confidentiel pour les victimes d’abus (SCVA) : a) quelles mesures sont prises afin d’assurer une meilleure coordination fédérale-provinciale aux fins de la prestation du SCVA; b) quand une victime entre dans le programme SCVA, quelles mesures sont prises pour veiller à ce qu’une identité protégée soit offerte le plus rapidement possible; c) comment le programme SCVA veille-t-il à ce que les victimes obtiennent le soutien et les services voulus au cours de la période de traitement de leur nouvelle identité; d) quel accès à un logement protégé et quelle aide financière le programme SCVA offre-t-il aux victimes qui intègrent le programme; e) quelles mesures correctives le gouvernement compte-t-il prendre à l’égard du fait que, par le passé, les victimes qui avaient recours au programme SCVA ne se voyaient pas offrir de logement convenable ni d’aide financière; f) quelles mesures sont prises pour veiller à ce que les victimes qui intègrent le programme SCVA n’aient pas aujourd’hui les mêmes difficultés à obtenir le logement et l’aide financière voulus; g) quels services offre-t-on aux victimes qui profitent du programme SCVA une fois qu’elles ont obtenu une identité protégée; h) comment ces services sont-ils coordonnés entre les provinces et entre chaque province et le gouvernement fédéral; i) si l’identité protégée est compromise ou révélée, quels recours le programme offre-t-il aux victimes; j) comment les victimes dont l’identité est compromise peuvent-elles obtenir des services et un soutien supplémentaires; k) si une victime a des plaintes à formuler à l’égard des services reçus du programme SCVA, quels sont ses recours; l) si une victime a des plaintes à formuler à l’égard de la rapidité des services offerts, quels sont ses recours; m) quels sont les délais de prestation des services du programme SCVA; n) comment les délais de prestation des services du SCVA sont-ils coordonnés avec les provinces; o) quelle est la politique du gouvernement au sujet du lien entre le SCVA et son obligation de protéger les femmes et les jeunes filles contre la violence?
Q-4652 — February 15, 2012 — Mr. Casey (Charlottetown) — With regard to websites accessed on the personal departmental desktop computers, laptop computers, mobile phones, tablet computers, or other internet-enabled devices issued to the Minister of Justice and to the Minister of Public Safety: (a) what are the URLs of all websites accessed on said devices between 12:01 a.m. on February 1, 2012, and 12:01 a.m. on February 14, 2012 (all dates and times inclusive), listed by ministry; and (b) at what times were those websites accessed, listed by ministry? Q-4652 — 15 février 2012 — M. Casey (Charlottetown) — En ce qui concerne les sites Web consultés à partir des ordinateurs de bureau, des ordinateurs portatifs, des téléphones cellulaires, des tablettes électroniques ou d'autres appareils gouvernementaux offrant un accès à Internet confiés au ministre de la Justice et au ministre de la Sécurité publique : a) quelles sont les adresses URL de tous les sites consultés à partir desdits appareils entre 0 h 1, le 1er février 2012 et 0 h 1, le 14 février 2012 (toutes dates et heures comprises), indiquées par ministère; b) à quelles heures ces sites Web ont-ils été consultés, indiquées par ministère?
Q-4662 — February 16, 2012 — Mr. Andrews (Avalon) — With regard to the government's plan to forgive a portion of Canada Student Loans for new family physicians, nurse practitioners, and nurses, practicing in under-served rural or remote Canadian communities: (a) when will individuals begin to receive loan forgiveness; (b) how many individuals are projected to qualify for loan forgiveness in fiscal year 2012-2013; (c) what is the projected value of loans that will be forgiven; and (d) what will the process be for individuals to apply to have their loans forgiven? Q-4662 — 16 février 2012 — M. Andrews (Avalon) — En ce qui concerne le plan du gouvernement visant à annuler une partie de la composante fédérale des prêts aux étudiants que doivent rembourser les médecins de famille, le personnel infirmier praticien et le personnel infirmier qui viennent d’obtenir leurs diplômes et qui travaillent dans des collectivités canadiennes mal desservies en milieu rural ou éloigné : a) quand ces personnes pourront-elles commencer à profiter de l’annulation de prêts; b) selon les estimations, combien de personnes seront admissibles à l’annulation pour l’exercice 2012-2013; c) quelle est la valeur estimée des prêts qui seront annulés; d) quel processus devront suivre ces personnes pour demander l’annulation de leurs prêts?
Q-4672 — February 16, 2012 — Mr. Andrews (Avalon) — With regard to aboriginal communities: (a) how many audits or evaluations were initiated or completed between January 1, 1990, and December 21, 2010, inclusive, concerning grants, contributions or other transfers from any government department or agency, or concerning the financial management or operations, of (i) the Innu nation of Labrador, (ii) Sheshatshiu Innu First Nation, including the former Sheshatshiu Innu Band Council, (iii) Mushuau Innu First Nation or Natuashish First Nation, including the former Davis Inlet Band Council and Utshimassits Band Council, (iv) the Innu Healing Foundation, (v) Mamu Tshishkutamashutau - Innu Education Inc., (vi) Innu Business Development Centre, (vii) Innu Development Limited Partnership, (viii) Innu Recreation Complexes Inc.; (b) which department or agency conducted each audit or evaluation referenced in subquestion (a); (c) what was the date of each audit and evaluation; and (d) what are the internal file or reference numbers associated with each audit and evaluation? Q-4672 — 16 février 2012 — M. Andrews (Avalon) — En ce qui concerne les communautés autochtones : a) combien de vérifications ou d’évaluations ont été entreprises ou complétées entre le 1er janvier 1990 et le 21 décembre 2010 inclusivement, concernant les contributions ou autres transferts d’un ministère ou d’un organisme gouvernemental, ou concernant la gestion financière ou l’administration (i) de la Nation Innu du Labrador, (ii) de la Première nation des Innus de Sheshatshiu, y compris l’ancien conseil de bande des Innus de Sheshatshiu, (iii) de la Première nation des Innus de Mushuau ou de la Première nation de Natuashish, y compris l’ancien conseil de bande de Davis Inlet et le conseil de bande d’Utshimassits, (iv) de la Innu Healing Foundation, (v) de Mamu Tshishkutamashutau - Innu Education Inc., (vi) du Centre de développement commercial innu, (vii) du Innu Development Limited Partnership, (viii) de Innu Recreation Complexes Inc.; b) quel ministère ou organisme a mené chaque vérification ou évaluation mentionnée en a); c) à quelle date fut effectuée chaque vérification ou évaluation; d) quels sont les numéros de dossier ou de référence internes associés à chaque vérification ou évaluation?
Q-4682 — February 16, 2012 — Mr. Cuzner (Cape Breton—Canso) — With regard to the Canada First Defence Strategy: (a) does the strategy include (i) acquisition of three strategic air transport aircraft and stationing them at CFB Trenton, (ii) doubling the size of the Disaster Assistance Response Team (DART), (iii) acquisition of three armed naval heavy icebreakers, and stationing them in the area of Iqaluit, (iv) building a new civilian-military deepwater docking facility to accommodate the three armed naval heavy icebreakers mentioned in subquestion (iii), (v) establishing a new underwater sensor system, (vi) building a new army training centre in the area of Cambridge Bay, (vii) stationing new long-range unmanned aerial vehicle squadrons at both CFB Goose Bay and CFB Comox, (viii) stationing new fixed-wing search and rescue aircraft in Yellowknife, (ix) increasing the size of the Canadian Rangers by 500 members, (x) establishing a 650-member regular forces battalion at CFB Comox, CFB Goose Bay, CFB Trenton, and CFB Bagotville respectively, (xi) adding 1,000 regular force and 750 reserve force personnel to the army in Quebec, (xii) establishing a territorial defence unit in Vancouver, Calgary, Regina, Winnipeg, Ottawa, Toronto, Montreal, Quebec City, Saint John, St. John's, Halifax and the Niagara-Windsor corridor respectively, (xiii) recruiting 1,000 regular force personnel for the purpose of improving and enlarging the Atlantic fleet, (xiv) increasing the number of personnel in CFB Gagetown, (xv) stationing new aircraft and personnel at CFB Greenwood, (xvi) increasing the numbers of Pacific navy regular force personnel by about 500, (xvii) deploying new fixed-wing search and rescue aircraft at CFB Comox and CFB Winnipeg, (xviii) upgrading fighter aircraft at CFB Cold Lake; (b) what is the rationale for the inclusion or exclusion, from the Canada First Defence Strategy, of each of the items mentioned in subquestions (a)(i) to (a)(xviii); and (c) for each item mentioned in subquestions (a)(i) to (a)(xviii) that is not a part of the strategy, (i) has the government taken any steps to carry out or implement the item, (ii) if the government has not taken any such steps, does it intend to do so, (iii) if the government does intend to implement the item, when does it intend to do so? Q-4682 — 16 février 2012 — M. Cuzner (Cape Breton—Canso) — En ce qui concerne la Stratégie de défense Le Canada d'abord : a) la stratégie comprend-elle (i) l’acquisition de trois aéronefs de transport aérien stratégique et leur stationnement à la BFC Trenton, (ii) l’augmentation de la taille de l’Équipe d'intervention en cas de catastrophe (EICC) en la multipliant par deux, (iii) l’acquisition de trois brise-glace lourds armés et leur stationnement dans la région d’Iqaluit, (iv) la construction d’une nouvelle installation d'accostage civile et militaire en eau profonde pour accueillir les trois brise-glace lourds armés mentionnés à la sous-question (iii), (v) l’établissement d’un nouveau système de détection sous-marin, (vi) la construction d’un nouveau centre d'instruction de l'Armée de terre dans la région de Cambridge Bay, (vii) le stationnement de nouveaux escadrons de véhicules aériens sans pilote à long rayon d’action aux BFC Goose Bay et Comox, (viii) le stationnent de nouveaux aéronefs de recherche et de sauvetage à voilure fixe à Yellowknife, (ix) l’ajout de 500 membres aux Rangers canadiens, (x) l’établissement d’un bataillon de la force régulière de 650 membres aux BFC Comox, Goose Bay, Trenton et Bagotville, respectivement, (xi) l’ajout de 1 000 membres de la force régulière et de 750 membres de la force de réserve de l’Armée de terre au Québec, (xii) l’établissement d’une unité de défense du territoire à Vancouver, Calgary, Regina, Winnipeg, Ottawa, Toronto, Montréal, Québec, Saint John, St. John's, Halifax ainsi que dans le corridor Niagara-Windsor, respectivement, (xiii) le recrutement de 1 000 membres de la force régulière dans le but de développer et de grossir la flotte de l’Atlantique, (xiv) l’augmentation du nombre de membres à la BFC Gagetown, (xv) le stationnement de nouveaux aéronefs et de nouveaux membres à la BFC Greenwood, (xvi) l’ajout d’environ 500 membres à la force navale régulière du Pacifique, (xvii) le déploiement de nouveaux aéronefs de recherche et de sauvetage à voilure fixe aux BFC Comox et Winnipeg, (xviii) la mise à niveau des avions de chasse à la BFC Cold Lake; b) pour quelles raisons chacun des éléments mentionnés aux sous-questions a)(i) à a)(xviii) est-il inclus à la Stratégie de défense Le Canada d'abord ou en est-il exclus; c) pour chaque élément mentionné aux sous questions a)(i) to a)(xviii) qui ne fait pas partie de la stratégie, (i) le gouvernement a-t-il pris des mesures pour exécuter ou mettre en œuvre l’élément, (ii) s’il ne l’a pas fait, entend-il le faire, (iii) s’il a l’intention de mettre en œuvre l’élément, quand prévoit-il le faire?
Q-4692 — February 16, 2012 — Mr. Cuzner (Cape Breton—Canso) — With regards to letters or electronic mail messages received by Ministers from Canadians since January 1, 2012, how many have been received: (a) by the Minister of Industry concerning copyright legislation; (b) by the Minister of Canadian Heritage concerning copyright legislation; and (c) by the Minister of Justice concerning “lawful access” legislation in general or Bill C-30, An Act to enact the Investigating and Preventing Criminal Electronic Communications Act and to amend the Criminal Code and other Acts, in particular? Q-4692 — 16 février 2012 — M. Cuzner (Cape Breton—Canso) — En ce qui concerne les lettres ou les messages de courrier électronique envoyés par des Canadiens et reçus par des ministres depuis le 1er janvier 2012, combien ont été reçus : a) par le ministre de l’Industrie au sujet de la loi sur le droit d’auteur; b) par le ministre du Patrimoine canadien au sujet de la loi sur le droit d’auteur; c) par le ministre de la Justice au sujet de « l’accès légal » en général ou en ce qui concerne le projet de loi C-30, Loi édictant la Loi sur les enquêtes visant les communications électroniques criminelles et leur prévention et modifiant le Code criminel et d’autres lois, plus particulièrement?
Q-4702 — February 16, 2012 — Mr. MacAulay (Cardigan) — With regard to the office of Ambassador for Fisheries Conservation, between January 1, 2007, and March 31, 2011, inclusive: (a) for each of the Ambassador’s trips made in connection with his duties, what were the (i) dates, (ii) destinations, (iii) total expenses; and (b) for all meetings convened or attended by the Ambassador in connection with his duties, what or who were the (i) dates, (ii) locations, (iii) participants? Q-4702 — 16 février 2012 — M. MacAulay (Cardigan) — En ce qui concerne le bureau de l’Ambassadeur pour la conservation des pêches, entre le 1er janvier 2007 et le 31 mars 2011, inclusivement : a) pour chaque voyage de l’ambassadeur effectué dans le cadre de ses fonctions, quelles ont été (i) les dates, (ii) les destinations, (iii) les dépenses totales; b) pour toutes les réunions organisées par l’ambassadeur ou auxquelles il a assisté dans le cadre de ses fonctions, quels ont été (i) les dates, (ii) les endroits, (iii) les participants?
Q-4712 — February 16, 2012 — Mr. MacAulay (Cardigan) — With regard to government real property: (a) what have been the total expenditures, in each fiscal year since the government acquired the property, for the maintenance, renovation, or other work performed in or on the former Embassy of the United States on Wellington Street, Ottawa, Ontario; and (b) what are the details of all such work? Q-4712 — 16 février 2012 — M. MacAulay (Cardigan) — En ce qui concerne les biens immobiliers du gouvernement : a) quel est le total des dépenses, pour chaque exercice depuis que le gouvernement a acquis le bien, pour l’entretien, la rénovation ou les autres travaux effectués à l’ancienne ambassade des États-Unis située sur la rue Wellington, à Ottawa (Ontario); b) quels sont les détails de tels travaux?
Q-4722 — February 16, 2012 — Ms. Bennett (St. Paul's) — With regard to Attawapiskat First Nation: (a) how many visits have been made by employees of the government to Attawapiskat First Nation since January 2010; (b) what are the names and positions of the employees who made these visits; (c) what was the purpose of these visits; and (d) did these employees issue any official reports or communications about Attawapiskat First Nation, and, if so, what were the contents of these reports or communications? Q-4722 — 16 février 2012 — Mme Bennett (St. Paul's) — En ce qui concerne la Première nation d’Attawapiskat : a) combien de visites les employés du gouvernement ont-ils faites à la Première nation d’Attawapiskat depuis janvier 2010; b) quels sont les noms et les postes des employés qui ont fait ces visites; c) quel était le but de ces visites; d) ces employés ont-ils soumis des rapports ou des communiqués officiels sur la Première nation d’Attawapiskat et, le cas échéant, quel était le contenu de ces rapports ou de ces communiqués?
Q-4732 — February 16, 2012 — Mr. Coderre (Bourassa) — With regard to the trip by the Minister of Citizenship, Immigration and Multiculturalism to New Zealand and Thailand in July and August of 2011, who were all of the staff and guests who accompanied the Minister? Q-4732 — 16 février 2012 — M. Coderre (Bourassa) — En ce qui concerne le voyage que le ministre de la Citoyenneté, de l’Immigration et du Multiculturalisme a fait en Nouvelle-Zélande et en Thaïlande en juillet et août 2011, qui étaient les employés et les invités qui ont accompagné le ministre?
Q-4742 — February 16, 2012 — Mr. Eyking (Sydney—Victoria) — With regard to the Department of Fisheries and Oceans' (DFO) planned modernization of fisheries management: (a) how many jobs will be lost or relocated due to the move to an online license renewal and payment system; (b) what offices will be affected and where are they located; (c) does the government have a plan in place to assure that every fisher in every fishing community, including those who live in predominantly rural areas of the country, many of whom do not have access to high-speed internet, will have equal service standards; (d) what is the government’s plan to provide equal service to those fishers who do not and will not have access to the internet; (e) how will services be affected for those who do not and will not have access to the internet; and (f) what is the government’s plan to allow fishers who do not and will not have access to the internet to make the kinds of last minute changes in their files that could previously be made by telephone? Q-4742 — 16 février 2012 — M. Eyking (Sydney—Victoria) — En ce qui concerne le projet de modernisation de la gestion des pêches du ministère des Pêches et des Océans (MPO) : a) combien d’emplois seront supprimés ou déplacés en raison de l’établissement d’un système de renouvellement et de paiement des permis en ligne; b) quels bureaux seront touchés et où se trouvent-ils; c) le gouvernement dispose-t-il d’un plan pour veiller à ce que chaque pêcheur, dans chaque communauté de pêcheurs, y compris ceux qui vivent essentiellement dans des régions rurales, où tous n’ont pas accès à Internet haute vitesse, profite des mêmes normes de service; d) quel est le plan du gouvernement pour offrir un service équivalent aux pêcheurs qui n’ont pas et qui n’auront pas accès à Internet; e) quel sera l’effet sur les services pour ceux qui n’ont pas et qui n’auront pas accès à Internet; f) quel est le plan du gouvernement pour permettre aux pêcheurs qui n’ont pas et qui n’auront pas accès à Internet d’apporter des changements de dernière minute à leurs dossiers, comme ils pouvaient auparavant le faire par téléphone?
Q-4752 — February 16, 2012 — Mr. Coderre (Bourassa) — With regard to the Prime Minister’s Office, as of February 1, 2012, how many people did it employ and of those (i) how many make a salary of $100,000 a year or more, (ii) how many make a salary of $50,000 a year or less? Q-4752 — 16 février 2012 — M. Coderre (Bourassa) — En ce qui concerne le Cabinet du premier ministre, en date du 1er février 2012, combien de personnes a-t-il employées et parmi celles-ci (i) combien gagnent un salaire annuel de 100 000 $ ou plus, (ii) combien gagnent un salaire annuel de 50 000 $ ou moins?
Q-4762 — February 16, 2012 — Mr. Eyking (Sydney—Victoria) — With regard to the Department of Fisheries and Oceans' (DFO) cuts to the Aquaculture Collaborative Research and Development Program (ACRDP): (a) how many jobs will be lost due to this cut and in what regions will any and all job losses occur; (b) what, if any, similar resources are available to small and medium sized businesses in the aquaculture industry for research and development; (c) what has been the total budget allocated for the ACRDP over each of the past ten years; (d) what is the total breakdown of all money spent by DFO on the ACRDP over the past ten years; (e) what companies has the ACRDP worked with and where are they located; and (f) what tangible benefits have arisen from research done by the ACRDP? Q-4762 — 16 février 2012 — M. Eyking (Sydney—Victoria) — En ce qui concerne les réductions du ministère des Pêches et des Océans (MPO) à l’égard du Programme coopératif de recherche-développement en aquaculture (PCRDA) : a) combien d’emplois seront perdus en raison de ces réductions et dans quelles régions ces pertes d’emploi auront-elles lieu; b) le cas échéant, quelles ressources semblables sont à la disposition des petites et moyennes entreprises de l’industrie de l’aquaculture aux fins de la recherche et du développement; c) quel a été le budget total attribué au PCRDA au cours des dix dernières années; d) quelle est la répartition de toutes les sommes affectées au PCRDA par le MPO au cours des dix dernières années; e) avec quelles entreprises le PCRDA a-t-il collaboré et où sont-elles situées; f) quels avantages concrets a produit la recherche effectuée par le PCRDA?
Q-4772 — February 23, 2012 — Ms. Foote (Random—Burin—St. George's) — With regard to the one-time projected closing costs of the Maritime Rescue Sub Centre in St. John’s (MRSC St. John’s) and the consolidation of MRSC St. John’s to Joint Rescue Coordination Centre Halifax (JRCC Halifax) and Joint Rescue Coordination Centre Trenton (JRCC Trenton), what is the total cost of: (a) consolidating MRSC St. John’s to JRCC Halifax and JRCC Trenton; (b) new training at JRCC Halifax and JRCC Trenton, including language training and overtime hours for replacement employees while employees are being trained; (c) relocation to JRCC Halifax and JRCC Trenton; (d) upgrades required to JRCC Halifax and JRCC Trenton; (e) benefits paid to employees who choose to leave the public service as a result of the consolidation; (f) recruitment of candidates to replace services provided by MRSC St. John’s; (g) travel for personnel and project managers between JRCC Halifax, JRCC Trenton, MRSC St. John’s and Ottawa as a result of the consolidation; (h) project management, including the replacement and supplementing of the Regional Superintendent of Search and Rescue to assist with consolidation logistics; and (i) other work force adjustments obligations, including reasonable job offers to affected employees? Q-4772 — 23 février 2012 — Mme Foote (Random—Burin—St. George's) — En ce qui concerne les coûts prévus non récurrents de fermeture du Centre secondaire de sauvetage maritime de St. John’s (MRSC de St. John’s) et la fusion du MRSC de St. John’s avec le Centre conjoint de coordination des opérations de sauvetage à Halifax (JRCC Halifax) et le Centre conjoint de coordination des opérations de sauvetage à Trenton (JRCC Trenton), quel est le coût total : a) de la fusion du MRSC de St. John’s avec le JRCC Halifax et le JRCC Trenton; b) de la nouvelle formation qui sera donnée au JRCC Halifax et au JRCC Trenton, y compris la formation linguistique et les heures supplémentaires nécessaires pour remplacer le personnel en formation; c) du déménagement au JRCC Halifax et au JRCC Trenton; d) des mises à niveau nécessaires au JRCC Halifax et au JRCC Trenton; e) des prestations versées aux employés qui choisissent de quitter la fonction publique en raison de la fusion; f) du recrutement de candidats pour remplacer les services fournis par le MRSC de St. John’s; g) des déplacements du personnel et des gestionnaires de projets entre le JRCC Halifax, le JRCC Trenton, le MRSC de St. John’s et Ottawa en raison de la fusion; h) de la gestion de projets, dont le remplacement du surintendant régional, Recherche et sauvetage, afin de voir aux aspects logistiques de la fusion; i) d’autres obligations de réaménagement des effectifs, comme les offres d’emploi raisonnables aux employés touchés?
Q-4782 — February 23, 2012 — Ms. Mathyssen (London—Fanshawe) — With regard to all Governor in Council appointments: (a) what criteria are used to determine the suitability of appointees; (b) have any organizations with appointed directors adopted a gender-parity policy for their boards of directors; (c) is there a government policy on gender representation on boards appointed through Order in Council; (d) has the Privy Council Office designated responsibility for monitoring gender representation on boards appointed through Order in Council; and (e) what percentage of all appointments made since February 6, 2006, were of female appointees, broken down by organization and by year? Q-4782 — 23 février 2012 — Mme Mathyssen (London—Fanshawe) — En ce qui concerne toutes les nominations par le gouverneur en conseil : a) quels critères servent à déterminer la qualité des personnes nommées; b) des organisations comptant des administrateurs nommés ont-elles adopté une politique de parité hommes-femmes pour leur conseil d’administration; c) existe-t-il une politique gouvernementale sur la représentation des hommes et des femmes aux conseils nommés par décret; d) le Bureau du Conseil privé a-t-il désigné l’entité responsable de surveiller la représentation entre les femmes et les hommes aux conseils établis par décret; e) quel pourcentage de l’ensemble des administrateurs nommés depuis le 6 février 2006 sont des femmes, par organisation et par année?
Q-4792 — February 23, 2012 — Mr. Cuzner (Cape Breton—Canso) — With respect to the Canadian Revenue Agency’s (CRA) searchable charity database, and providing a detailed justification for any information that is not supplied: (a) when was the database created; (b) what was the initial cost to create the database; (c) how many staff were initially required to administer the database; (d) have there been any major upgrades to the database since it has been created, and, if so, (i) when, (ii) for what reason, (iii) at what total cost; (e) what is the annual cost to run and administer the searchable database, including, (i) staffing costs, (ii) technology costs, (iii) general administration costs, (iv) any other major costs for the fiscal years 2008-2009, 2009-2010, 2010-2011; (f) to administer the database in fiscal year 2008-2009, 2009-2010, and 2010-2011, how many (i) staff positions were required, (ii) total employees were required; (g) how many charitable returns were filed with CRA for the fiscal years 2008-2009, 2009-2010, and 2010-2011; (h) what is the aggregate amount of all transactions and all disbursements, or book value in the case of investments and assets, in excess of $5,000 made by the CRA with respect to the functioning and administration of the charitable database, broken down individually by (i) name and address of payer and payee, (ii) purpose and description of the transaction, (iii) specific amount that has been paid or received or that is to be paid or received; (i) for all of the transactions referenced in subquestion (h), what is the breakdown of these transactions according to (i) disbursements for education and training activities, (ii) disbursements for general overhead, (iii) disbursements for administration, (iv) disbursements to employees and contractors including gross salary, stipends, periodic payments, benefits (including pension obligations), vehicles, bonuses, gifts, service credits, lump sum payments, and other forms of remuneration; and (j) what is the description, cost, book value, and price paid for all investments and fixed assets associated with the functioning and administration of the database? Q-4792 — 23 février 2012 — M. Cuzner (Cape Breton—Canso) — En ce qui concerne la base de données interrogeable de l'Agence du revenu du Canada (ARC) sur les organismes de bienfaisance, et en fournissant une justification détaillée pour tout renseignement non communiqué : a) quand la base de données a-t-elle été créée; b) combien a coûté initialement la création de la base de données; c) combien d'employés ont été affectés initialement à l'administration de la base de données; d) la base de données a-t-elle fait l'objet de mises à niveau importantes depuis sa création et, si c'est le cas, (i) quand, (ii) pourquoi, (iii) quel en a été le coût total; e) combien coûte chaque année le fonctionnement et l'administration de la base de données, y compris, (i) le coût du personnel, (ii) le coût de la technologie, (iii) le coût de l'administration générale, (iv) tout autre coût important pour les exercices 2008-2009, 2009-2010 et 2010-2011; f) l'administration de la base de données lors des exercices 2008-2009, 2009-2010 et 2010-2011 a exigé combien (i) de postes, (ii) d'employés au total; g) combien de déclarations de dons ont été produites à l'ARC lors des exercices 2008-2009, 2009-2010 et 2010-2011; h) quel est le montant global de toutes les transactions et de tous les versements, ou de la valeur comptable dans le cas des investissements et des actifs, de plus de 5 000 $ que l'ARC a faits pour assurer le fonctionnement et l'administration de la base de données, montant réparti individuellement selon (i) le nom et l'adresse du payeur et du bénéficiaire, (ii) l'objet et la description de la transaction, (iii) le montant précis versé ou reçu ou à verser ou recevoir; i) pour toutes les transactions visées dans la sous-question h), comment se répartissent-elles selon (i) le montant consacré aux activités d'éducation et de formation, (ii) le montant consacré aux frais généraux, (iii) le montant consacré à l'administration, (iv) le montant consacré aux employés et aux fournisseurs, y compris le salaire brut, les allocations, les paiements périodiques, les avantages sociaux (y compris les engagements de retraite), les véhicules, les primes, les cadeaux, les crédits de service, les paiements forfaitaires et d'autres formes de rémunération; j) quels sont la description, le coût, la valeur comptable et le prix payé de tous les investissements et les immobilisations corporelles associés au fonctionnement et à l'administration de la base de données?
Q-4802 — February 23, 2012 — Ms. Mathyssen (London—Fanshawe) — With regard to infrastructure spending since 2008-2009: (a) how much project funding has gone to non-Canadian firms by (i) year, (ii) country, (iii) government program; and (b) how much project funding has gone to public-private partnerships by (i) year, (ii) country, (iii) government program? Q-4802 — 23 février 2012 — Mme Mathyssen (London—Fanshawe) — En ce qui concerne les dépenses d’infrastructure depuis 2008-2009 : a) quelle part du financement des projets a été versée à des entreprises non canadiennes par (i) année, (ii) pays, (iii) programme gouvernemental; b) quelle part du financement des projets a été versée à des partenariats public-privé par (i) année, (ii) pays, (iii) programme gouvernemental?
Q-4812 — February 28, 2012 — Mr. Martin (Winnipeg Centre) — With regard to all payments made by the government to RackNine Inc. and Matt Meier in the last five years, has the government, including the Prime Minister’s Office, all government departments and agencies, minister’s offices and crown corporations, made such payments, and, if yes: (a) what was the total amount paid in each of the last five years; (b) what was the amount paid by each department, agency and crown corporation in each of the last five years; and (c) for each payment, (i) who made the payment (e.g., the Prime Minister’s Office, a department or agency, a minister’s office, a crown corporation, etc.), (ii) on what date was the payment made, (iii) what services were procured through the payment? Q-4812 — 28 février 2012 — M. Martin (Winnipeg-Centre) — En ce qui concerne tous les paiements effectués par le gouvernement à RackNine inc. et à Matt Meier au cours des cinq dernières années, le gouvernement, y compris le cabinet du premier ministre, tous les ministères et organismes gouvernementaux, les cabinets des ministres et les sociétés d’État, a-t-il effectué ces paiements et, si oui : a) quel était le montant total versé, pour chacune des cinq dernières années; b) quel était le montant payé par chaque ministère, organisme et société d’État pour chacune des cinq dernières années; c) pour chaque paiement, (i) qui a effectué le paiement (c’est-à-dire le cabinet du premier ministre, un ministère ou un organisme, le cabinet d’un ministre, une société d’État, etc.), (ii) à quelle date le paiement a-t-il été effectué, (iii) quels services ce paiement servait-il à procurer?
Q-4822 — February 28, 2012 — Mr. Martin (Winnipeg Centre) — With regard to all payments made by the government to Responsive Marketing Group Inc. in the last five years, has the government, including the Prime Minister’s Office, all government departments and agencies, minister’s offices and crown corporations, made such payments, and, if yes: (a) what was the total amount paid in each the last five years; (b) what was the amount paid by each department, agency and crown corporation in each of the last five years; and (c) for each payment, (i) who made the payment (e.g. the Prime Minister’s Office, a department or agency, a minister’s office, a crown corporation, etc.), (ii) on what date was the payment made, (iii) what services were procured through the payment? Q-4822 — 28 février 2012 — M. Martin (Winnipeg-Centre) — En ce qui concerne tous les paiements effectués par le gouvernement à Responsive Marketing Group inc. au cours des cinq dernières années, le gouvernement, y compris le cabinet du premier ministre, tous les ministères et organismes gouvernementaux, les cabinets des ministres et les sociétés d’État, a-t-il effectué ces paiements et, si oui : a) quel était le montant total versé, pour chacune des cinq dernières années; b) quel était le montant payé par chaque ministère, organisme et société d’État pour chacune des cinq dernières années; c) pour chaque paiement, (i) qui a effectué le paiement (c'est-à-dire le cabinet du premier ministre, un ministère ou un organisme, le cabinet d’un ministre, une société d’État, etc.), (ii) à quelle date le paiement a-t-il été effectué, (iii) quels services ce paiement servait-il à procurer?
Q-4832 — February 28, 2012 — Mr. Martin (Winnipeg Centre) — With regard to all payments made by the government to Campaign Research in the last five years, has the government, including the Prime Minister’s Office, all government departments and agencies, minister’s offices and crown corporations, made such payments, and, if yes: (a) what was the total amount paid in each of the last five years; (b) what was the amount paid by each department, agency and crown corporation in each of the last five years; and (c) for each payment, (i) who made the payment (e.g., the Prime Minister’s Office, a department or agency, a minister’s office, a crown corporation, etc.), (ii) on what date was the payment made, (iii) what services were procured through the payment? Q-4832 — 28 février 2012 — M. Martin (Winnipeg-Centre) — En ce qui concerne tous les paiements effectués par le gouvernement à Campaign Research au cours des cinq dernières années, le gouvernement, y compris le cabinet du premier ministre, tous les ministères et organismes gouvernementaux, les cabinets des ministres et les sociétés d’État, a-t-il effectué ces paiements et, si oui : a) quel était le montant total versé, pour chacune des cinq dernières années; b) quel était le montant payé par chaque ministère, organisme et société d’État pour chacune des cinq dernières années; c) pour chaque paiement, (i) qui a effectué le paiement (c’est-à-dire le cabinet du premier ministre, un ministère ou un organisme, le cabinet d’un ministre, une société d’État, etc.), (ii) à quelle date le paiement a-t-il été effectué, (iii) quels services ce paiement servait-il à procurer?
Q-4842 — February 28, 2012 — Mr. McKay (Scarborough—Guildwood) — With regard to the three project profiles located on the Canadian International Development Agency’s (CIDA) webpage, one for each of Colombia, Peru and Bolivia, entitled “Promoting Effective Corporate Social Responsibility”, for a total of twenty million dollars: (a) what are the executing agency and partners for each of the projects; (b) how much funding has been allocated for each project, (i) how much of the allocated funding has been spent, (ii) when was funding for each project first spent, (iii) what specific activities and expenses has the funding been spent on, (iv) in what specific area of each country has this funding been spent; (c) are there Canadian or other mining projects in these areas; and (d) do these three projects correspond to CIDA’s Andean Regional Initiative? Q-4842 — 28 février 2012 — M. McKay (Scarborough—Guildwood) — En ce qui concerne les trois profils affichés sur le site Web de l’Agence canadienne de développement international (ACDI) pour le projet Promouvoir la mise en place efficace de la responsabilité sociale des entreprises, doté d’un budget total de 20 millions de dollars, pour chacun des trois pays suivants : Colombie, Pérou et Bolivie : a) quels sont l’agence d’exécution et le partenaire de chacun des projets; b) quelle somme a été consentie à chaque projet, (i) quelle part de cette somme a été dépensée, (ii) quand les fonds ont-ils commencé à être dépensés, (iii) quelles activités et dépenses précises les fonds ont-ils servi à financer, (iv) dans quelle région de chacun des pays les fonds ont-ils été dépensés; c) y a-t-il des projets miniers canadiens ou autres en cours dans ces régions; d) ces trois projets correspondent-ils à l’Initiative régionale andine de l’ACDI?
Q-4852 — February 28, 2012 — Ms. Laverdière (Laurier-Sainte-Marie) — With respect to Export Development Canada’s (EDC) 2010 Corporate Social Responsibility Report and other commitments to social responsibility: (a) what methodology does EDC employ in its human rights assessments; (b) what criteria are employed by EDC to determine whether a human rights assessment will be undertaken for Category A and B projects; (c) to date, on the basis of what policy has EDC not publicly disclosed its human rights assessment methodology; (d) to date, on the basis of what policy has EDC not publicly disclosed the precise amounts of its loans, guarantees and insurance policies; (e) what is the definition of “benchmark” used by the Environmental and Social Review Directive; (f) what is the process for benchmarking projects by the Environmental and Social Review Directive; and (g) before issuing a $1 billion line of credit to Vale Ltd. in 2010, did EDC conduct an evaluation process concerning Vale’s environmental and human rights practices in its overseas operations, and what overseas operations were reviewed? Q-4852 — 28 février 2012 — Mme Laverdière (Laurier-Sainte-Marie) — En ce qui concerne le Rapport sur la responsabilité sociale des entreprises 2010 d’Exportation et développement Canada (EDC) et ses autres engagements à l’égard de la responsabilité sociale : a) quelle méthode utilise EDC pour l’évaluation des droits de la personne; b) quel critère utilise EDC pour déterminer si une évaluation des droits de la personne sera entreprise pour les projets de catégorie A et B; c) en vertu de quelle politique EDC n’a-t-elle pas encore fait connaître publiquement sa méthode d’évaluation des droits de la personne; d) en vertu de quelle politique EDC n’a-t-elle pas encore fait connaître publiquement les montants exacts de ses prêts, garanties et polices d’assurance; e) quelle définition du terme « repère » utilise-t-on aux fins de la Directive en matière d’évaluation environnementale et sociale; f) quel est le processus utilisé pour le repérage des projets aux fins de la Directive en matière d’évaluation environnementale et sociale; g) avant d’accorder une ligne de crédit de 1 milliard de dollars à Vale Ltd. en 2010, EDC a-t-elle mené un processus d’évaluation environnementale sur les pratiques de Vale en matière d’environnement et de droits de la personne dans ses activités à l’étranger et quelles activités menées à l’étranger ont fait l’objet d’un examen?
Q-4862 — February 28, 2012 — Ms. Laverdière (Laurier-Sainte-Marie) — With respect to financial assistance issued by Export Development Canada (EDC): (a) for the fiscal years 2009-2010 and 2010-2011, what is the total value of general corporate purpose loans; (b) what is the due diligence procedure regarding general corporate purposes loans; (c) what standards are used to assess the potential adverse environmental, social and human rights impacts associated with corporate activities that are funded through general corporate purpose loans; (d) what sources of information are used in order to assess the compliance standards referenced in subquestion (c); (e) what is EDC’s process for monitoring ongoing compliance by its clients with the standards referenced in subquestion (c), and what steps are taken in the event of non-compliance; (f) for all debt relief initiatives designed to reduce sovereign debt for each of the fiscal years from 1999-2000 to 2010-2011, (i) how many payments were received from the Government of Canada, (ii) what is the amount of payment, (iii) what countries received debt relief; (g) what is the total value of loans, lines of credit, guarantees and insurance provided by EDC to companies incorporated in tax havens as defined by the OECD in 2009, 2010 and 2011; (h) for all loans, lines of credit, guarantees and insurance to companies for exploration, extraction, transportation and processing of oil, gas and coal, for the fiscal years 2009-2010 and 2010-2011, (i) what is the name of the client for each transaction, (ii) what is the value of each transaction, (iii) what is the country of operation for each transaction; and (i) for all credit facilities and loans to Talisman Energy Inc. since 2006, (i) what is the dollar amount of each transaction, (ii) what is the description of each transaction, (iii) what is the country of investment for each transaction, (iv) are any applications currently being assessed? Q-4862 — 28 février 2012 — Mme Laverdière (Laurier-Sainte-Marie) — En ce qui concerne l’aide financière accordée par Exportation et développement Canada (EDC) : a) pour les exercices financiers 2009-2010 et 2010-2011, quelle est la valeur totale des prêts accordés pour les activités générales d’une entreprise; b) quelle est la procédure applicable à la diligence raisonnable concernant les prêts pour activités générales d’une entreprise; c) quelles sont les normes utilisées pour évaluer les répercussions négatives potentielles sur le plan environnemental, social et des droits de la personne des activités financées par le biais de prêts pour activités générales d’une entreprise; d) quelles sont les sources d’information utilisées pour évaluer les normes d’observation mentionnées à la sous-question c); e) que fait EDC pour surveiller l’observation par ses clients des normes mentionnées à la sous-question c), quelles sont les mesures prises en cas de non-observation; f) pour toutes les initiatives d’allégement de la dette destinées à réduire la dette souveraine pour chacun des exercices de 1999-2000 à 2010-2011, (i) combien de paiements ont été reçus du gouvernement du Canada, (ii) quel a été le montant du paiement, (iii) quels pays ont reçu une aide à l’allégement de la dette; g) quelle est la valeur totale des prêts, lignes de crédit, garanties et assurances accordés par EDC à des entreprises constituées en personnes morales dans des paradis fiscaux selon la définition de l’OCDE en 2009, 2010 et 2011; h) pour tous les prêts, lignes de crédit, garanties et assurances accordés à des entreprises pour l’exploration, l’extraction, le transport et le traitement du pétrole, du gaz et du charbon pour les exercices 2009-2010 et 2010-2011, (i) quel est le nom du client pour chaque transaction, (ii) quelle est la valeur de chaque transaction, (iii) quel est le pays d’exploitation pour chaque transaction; i) pour toutes les facilités de crédit et tous les prêts à Talisman Energy Inc. depuis 2006, (i) quel est le montant de chaque transaction, (ii) en quoi consiste chaque transaction, (iii) quel est le pays d’investissement pour chaque transaction, (iv) y a-t-il des demandes en voie d’évaluation?
Q-4872 — February 29, 2012 — Mr. Angus (Timmins—James Bay) — What is the total amount of government funding since fiscal year 2010-2011, up to and including the current fiscal year, allocated within the constituency of Timmins—James Bay, specifying each department or agency, initiative, and amount? Q-4872 — 29 février 2012 — M. Angus (Timmins—Baie James) — Quel est le montant total du financement gouvernemental distribué dans la circonscription de Timmins—Baie James depuis l’exercice 2010-2011 jusqu’à l’exercice en cours inclusivement, par ministère ou organisme, initiative et montant?
Q-4882 — February 29, 2012 — Mr. Angus (Timmins—James Bay) — With respect to the third-party management (TPM) of First Nations by Aboriginal Affairs and Northern Development Canada (AANDC) over the last 12 years: (a) how many First Nations reserves have been operating under co-management or TPM, (i) for how long, (ii) which reserves have been so designated; (b) for each of the reserves under co-management or TPM, (i) who acts as their third-party manager, (ii) under what authority have they been placed under TPM, (iii) on what date did each co-management or third-party management agreement come into force, (iv) what was the amount of debt they held at the time, (v) what debt repayment plan was put into effect for each, (vi) what was the debt when the co-management or TPM ended, (vii) what is the current amount of outstanding debt held by each band council; (c) what requirements must be met by a band council to get out of TPM, (i) who determines those requirements, (ii) how many bands have met those requirements and when; (d) how many audits has AANDC, or its designated proxies, undertaken with respect to third-party managers and their direction of First Nations bands, (i) on what date were such audits prepared, (ii) by whom, (iii) with respect to the management of which bands, (iv) what were the key findings of each audit, (v) what recommendations were implemented, (vi) has any audit resulted in the termination or non-renewal of the contract between the TPM and AANDC, and, if so, which ones and why, (vii) has any audit warranted a police investigation, and, if so, which ones and what was the outcome; (e) according to each community operating under TPM, (i) what management or other fees were charged, on a monthly and annual basis, (ii) what were the fees charged for, (iii) have any third-party managers received extra commissions, bonuses or any other financial reward for their work, and, if so, when was the money awarded, for what, and to which third party managers, (iv) what percentage of each band’s operating budget do such costs represent, on a monthly and annual basis; (f) what individuals, legal or otherwise, have been awarded contracts for co-management or TPM, (i) how many contracts were awarded, (ii) what was the amount of each contract, (iii) when was the contract awarded, (iv) what were the intended services; (g) what legal or professional requirements does a company have to meet to be awarded a contract in (i) co-management, (ii) third-party management; (h) what tendering process is followed in the awarding of co-management and TPM contracts; (i) do AANDC staff have any discretionary powers in awarding a co-management or TPM contract, and, if so, who has that power and under what circumstances; and (j) what evaluations has AANDC conducted of TPM either systematically or of individual cases, including titles and dates of publication? Q-4882 — 29 février 2012 — M. Angus (Timmins—Baie James) — En ce qui concerne la gestion par un tiers administrateur de Premières nations à la demande des Affaires autochtones et Développement du Nord Canada (AADNC) au cours des 12 dernières années : a) combien de réserves autochtones ont été soumises à la cogestion ou la gestion par un tiers administrateur, (i) pendant combien de temps, (ii) quelles réserves ont été ainsi désignées; b) pour chaque réserve gérée en cogestion ou par un tiers administrateur, (i) qui est le cogestionnaire ou le tiers administrateur, (ii) en vertu de quel pouvoir est-elle gérée par un tiers administrateur, (iii) quelle est la date d’entrée en vigueur de chaque entente de cogestion ou de gestion par un tiers administrateur, (iv) à combien s’élevait la dette à ce moment-là, (v) quel plan de remboursement de la dette a été établi pour chacune, (vi) à combien s’élevait l’encours de la dette à la fin de la cogestion ou de la gestion par un tiers administrateur, (vii) quelle est la dette existante de chaque conseil de bande; c) à quelles conditions un conseil de bande peut-il cesser d’être géré par un tiers administrateur, (i) qui établit ces conditions, (ii) combien de bandes ont satisfait à ces conditions et quand; d) combien de vérifications AADNC, ou ses représentants, ont-ils effectuées relativement aux tiers administrateurs et à leur gestion des bandes des Premières nations, (i) quand ces vérifications ont-elles été préparées, (ii) par qui, (iii) pour quelles bandes, (iv) quelles ont été les grandes conclusions de chaque vérification, (v) quelles recommandations ont été mises en œuvre, (vi) est-ce que des vérifications ont entraîné l’annulation ou le non-renouvellement du contrat entre le tiers administrateur et AADNC, si oui, lesquelles et pourquoi, (vii) est-ce que des vérifications ont donné lieu à une enquête policière et, si oui, lesquelles et quels ont été les résultats; e) pour chaque communauté assujettie à la gestion par un tiers administrateur, (i) quels frais de gestion ou autres ont été imputés mensuellement et annuellement, (ii) à quel titre les frais ont-ils été imputés, (iii) est-ce que ces tiers administrateurs ont reçu des commissions, primes ou autres avantages financiers en sus pour leur travail et, si oui, quand l’argent leur a-t-il été versé, pour quel motif, et à quels tiers administrateurs, (iv) quel pourcentage du budget d’exploitation de chaque bande ces coûts représentent-ils mensuellement et annuellement; f) quelles personnes, morales ou autres, ont obtenu des contrats de cogestion ou de gestion par un tiers administrateur, (i) combien de contrats ont été attribués, (ii) quel était le montant de chaque contrat, (iii) quand a-t-il été attribué, (iv) pour quels services; g) quels critères juridiques ou professionnels une entreprise doit-elle respecter pour obtenir un contrat (i) de cogestion, (ii) de gestion par un tiers administrateur; h) quels processus d’appel d’offres applique-t-on pour l’attribution des contrats de cogestion et de gestion par un tiers administrateur; (i) le personnel d’AADNC jouit-il de pouvoirs discrétionnaires dans l’attribution d’un contrat de cogestion ou de gestion par un tiers administrateur et, si oui, qui exerce ce pouvoir et dans quelles circonstances; (j) quelles évaluations, systématiques ou ponctuelles, les AADNC ont-elles effectuées des tiers administrateurs, notamment les titres et les dates de leur publication?
Q-4892 — February 29, 2012 — Mr. Caron (Rimouski-Neigette—Témiscouata—Les Basques) — With regard to the plan to modernize Canada’s Employment Insurance program and the 2011 decision to consolidate Employment Insurance processing centres: (a) what were the selection criteria for determining where the six processing centres in Quebec would be located as part of the call for tenders; (b) which criteria resulted in Thetford Mines being chosen over Rimouski for the location of a processing centre; (c) in terms of the selection criteria, what were the results for each location that submitted its candidacy; (d) what is the estimated or anticipated itemized cost of moving the processing centre from Rimouski to Thetford Mines; (e) what are the estimated or anticipated itemized cost savings, on an annual basis, of moving the processing centre from Rimouski to Thetford Mines; and (f) when was the final decision made to move the processing centre to Thetford Mines? Q-4892 — 29 février 2012 — M. Caron (Rimouski-Neigette—Témiscouata—Les Basques) — En ce qui concerne le plan de modernisation de l’assurance-emploi du Canada et la décision de 2011 de consolider les centres de traitement : a) quels ont été les critères de sélection pour le choix de l’emplacement des six centres de traitement au Québec dans le cadre de cet appel d’offres; b) quels critères ont été déterminants dans le choix de Thetford Mines, plutôt que Rimouski, pour installer un centre de traitement; c) selon les critères, quels ont été les résultats pour chacun des endroits ayant soumis leur candidature; d) quelle est la ventilation des coûts prévus ou estimés du transfert du centre de traitement de Rimouski vers Thetford Mines; e) quelles sont les économies prévues ou estimées, ventilées par année, du transfert du centre de traitement de Rimouski vers Thetford Mines; f) à quelle date la décision finale concernant la localisation du centre de traitement à Thetford Mines a-t-elle été prise?
Q-4902 — February 29, 2012 — Mr. Simms (Bonavista—Gander—Grand Falls—Windsor) — With regard to government procurement, for each of the following companies or individuals, namely, (a) RackNine; (b) RackNine Inc.; (c) RackNine Canada; (d) 2call; (e) 2call.ca and (f) Matt Meier of Edmonton, Alberta, what are the particulars of all and any government contracts for services provided, including (i) the time period covered by the contract, (ii) the nature or purpose of the service provided, (iii) the amount paid to the company or individual for their services, (iv) whether the contract was awarded through a competitive bidding process or was sole-sourced, (v) which government department or agency contracted with the company or individual, (vi) under which budgetary allocation was the company or individual paid for the service provided, (vii) the associated file or reference numbers for each contract? Q-4902 — 29 février 2012 — M. Simms (Bonavista—Gander—Grand Falls—Windsor) — En ce qui concerne les marchés publics, pour chacune des entreprises ou chacun des particuliers suivants, à savoir, a) RackNine; b) RackNine inc.; c) RackNine Canada; d) 2call; e) 2call.ca; f) Matt Meier d’Edmonton (Alberta), quels sont les détails de tous les contrats de services, y compris (i) la période couverte par le contrat, (ii) la nature ou l’objet des services fournis, (iii) le montant versé à l’entreprise ou au particulier pour ses services, (iv) si le contrat a été accordé dans le cadre d’un appel d’offres concurrentiel ou s’il s’agissait d’un fournisseur unique, (v) quel ministère ou organisme du gouvernement a accordé un contrat à l’entreprise ou au particulier, (vi) le crédit budgétaire en vertu duquel l’entreprise ou le particulier a été payé pour les services fournis, (vii) les numéros de dossier ou de référence associés à chaque contrat?

2 Response requested within 45 days
2 Demande une réponse dans les 45 jours